dc.contributorRodas Duran, Pedro Javier
dc.creatorRodas Duran, Pedro Javier
dc.creatorGuaman Guachichullca, Noe Rodrigo
dc.creatorColina Morles, Eliezer Null
dc.creatorPeña Ortega, Mario Patricio
dc.creatorSiguenza Guzman, Lorena Catalina
dc.date.accessioned2019-08-06T14:18:50Z
dc.date.accessioned2022-10-20T22:06:10Z
dc.date.available2019-08-06T14:18:50Z
dc.date.available2022-10-20T22:06:10Z
dc.date.created2019-08-06T14:18:50Z
dc.date.issued2019
dc.identifier000-000-000-0
dc.identifier1646-9895
dc.identifierhttp://dspace.ucuenca.edu.ec/handle/123456789/33260
dc.identifierhttps://search.proquest.com/docview/2260411361/fulltextPDF/B575C6556D4644E5PQ/1?accountid=36749
dc.identifier10.17013/risti.n.pi-pf
dc.identifier.urihttps://repositorioslatinoamericanos.uchile.cl/handle/2250/4608016
dc.description.abstractIn the assembly industry, there is a high degree of uncertainty when identifying operational problems, due to limited resources and inefficient production control. Focusing on the assembly of bicycles, this article presents a model that combines linear programming and fuzzy logic to obtain standard times associated with the production lines of bicycles. The tool used for minimizing the objective function was Excel "Solver", and its formulation involved the identification of variables, restrictions, constant parameters, working conditions and production rates. The times obtained from the linear programming model entered as variables in the fuzzy logic model, to yield standard times estimates. This study allows an identification of the current state of the productive process, obtaining the maximum benefit in operative resources and working conditions. In addition, the model improves decision making through uncertainty control in production planning.
dc.languagees_ES
dc.publisherPontificia Universidad Católica del Ecuador
dc.sourceRISTI - Revista Ibérica de Sistemas e Tecnologias de Informacao
dc.subjectFunción De Pertenencia
dc.subjectLógica Difusa
dc.subjectProgramación Lineal
dc.subjectReglas Difusas
dc.subjectTiempo Estándar
dc.titleModelo matemático basado en programación lineal y lógica difusa para predicción de tiempos en industrias de ensamble de bicicletas
dc.typeARTÍCULO DE CONFERENCIA


Este ítem pertenece a la siguiente institución