dc.contributorMedeiros, Pledson Guedes de
dc.contributor
dc.contributorhttp://lattes.cnpq.br/3043637097815581
dc.contributor
dc.contributorhttp://lattes.cnpq.br/5283839079235343
dc.contributorValença, Dione Maria
dc.contributor
dc.contributorhttp://lattes.cnpq.br/7402574019454862
dc.contributorCosta, Antonio Fernando Branco
dc.contributor
dc.contributorhttp://lattes.cnpq.br/6100382011052492
dc.creatorSampaio, Elvis dos Santos
dc.date.accessioned2015-02-26
dc.date.accessioned2015-03-03T15:28:33Z
dc.date.accessioned2022-10-06T13:54:52Z
dc.date.available2015-02-26
dc.date.available2015-03-03T15:28:33Z
dc.date.available2022-10-06T13:54:52Z
dc.date.created2015-02-26
dc.date.created2015-03-03T15:28:33Z
dc.date.issued2012-07-20
dc.identifierSAMPAIO, Elvis dos Santos. Grafico misto de controle da media com amostragem em dois estagios. 2012. 82 f. Dissertação (Mestrado em Probabilidade e Estatística; Modelagem Matemática) - Universidade Federal do Rio Grande do Norte, Natal, 2012.
dc.identifierhttps://repositorio.ufrn.br/jspui/handle/123456789/18642
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/3973655
dc.description.abstractThis paper proposes a new control chart to monitor a process mean employing a combined npx-X control chart. Basically the procedure consists of splitting the sample of size n into two sub-samples n1 and n2 determined by an optimization search. The sampling occur in two-stages. In the first stage the units of the sub-sample n1 are evaluated by attributes and plotted in npx control chart. If this chart signs then units of second sub-sample are measured and the monitored statistic plotted in X control chart (second stage). If both control charts sign then the process is stopped for adjustment. The possibility of non-inspection in all n items may promote a reduction not only in the cost but also the time spent to examine the sampled items. Performances of the current proposal, individual X and npx control charts are compared. In this study the proposed procedure presents many competitive options for the X control chart for a sample size n and a shift from the target mean. The average time to sign (ATS) of the current proposal lower than the values calculated from an individual X control chart points out that the combined control chart is an efficient tool in monitoring process mean.
dc.publisherUniversidade Federal do Rio Grande do Norte
dc.publisherBR
dc.publisherUFRN
dc.publisherPrograma de Pós-Graduação em Matemática Aplicada e Estatística
dc.publisherProbabilidade e Estatística; Modelagem Matemática
dc.rightsAcesso Aberto
dc.subjectMonitoramento de processos
dc.subjectGráficos de controle
dc.subjectGráficos X-barra e npx
dc.subjectJunção de gráficos de controle
dc.subjectGráfico combinado
dc.titleGrafico misto de controle da media com amostragem em dois estagios
dc.typemasterThesis


Este ítem pertenece a la siguiente institución