dc.contributorSalazar, Andrés Ortiz
dc.contributor
dc.contributor
dc.contributorhttp://lattes.cnpq.br/7865065553087432
dc.contributorLima, João Alves de
dc.contributor
dc.contributorhttp://lattes.cnpq.br/2699729486137957
dc.contributorAlmeida, Otacílio da Mota
dc.contributor
dc.contributorhttp://lattes.cnpq.br/1721353262824215
dc.contributorEstevam, Valdir
dc.contributor
dc.contributorhttp://lattes.cnpq.br/9264004380006248
dc.contributorMaitelli, André Laurindo
dc.contributor
dc.contributorhttp://lattes.cnpq.br/0477027244297797
dc.creatorAssmann, Benno Waldemar
dc.date.accessioned2008-10-02
dc.date.accessioned2014-12-17T14:54:48Z
dc.date.accessioned2022-10-06T12:29:09Z
dc.date.available2008-10-02
dc.date.available2014-12-17T14:54:48Z
dc.date.available2022-10-06T12:29:09Z
dc.date.created2008-10-02
dc.date.created2014-12-17T14:54:48Z
dc.date.issued2008-02-08
dc.identifierASSMANN, Benno Waldemar. Estudo de estratégias de otimização para poços de petróleo com elevação por bombeio de cavidades progressivas. 2008. 248 f. Tese (Doutorado em Automação e Sistemas; Engenharia de Computação; Telecomunicações) - Universidade Federal do Rio Grande do Norte, Natal, 2008.
dc.identifierhttps://repositorio.ufrn.br/jspui/handle/123456789/15116
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/3953212
dc.description.abstractThe progressing cavity pump artificial lift system, PCP, is a main lift system used in oil production industry. As this artificial lift application grows the knowledge of it s dynamics behavior, the application of automatic control and the developing of equipment selection design specialist systems are more useful. This work presents tools for dynamic analysis, control technics and a specialist system for selecting lift equipments for this artificial lift technology. The PCP artificial lift system consists of a progressing cavity pump installed downhole in the production tubing edge. The pump consists of two parts, a stator and a rotor, and is set in motion by the rotation of the rotor transmitted through a rod string installed in the tubing. The surface equipment generates and transmits the rotation to the rod string. First, is presented the developing of a complete mathematical dynamic model of PCP system. This model is simplified for use in several conditions, including steady state for sizing PCP equipments, like pump, rod string and drive head. This model is used to implement a computer simulator able to help in system analysis and to operates as a well with a controller and allows testing and developing of control algorithms. The next developing applies control technics to PCP system to optimize pumping velocity to achieve productivity and durability of downhole components. The mathematical model is linearized to apply conventional control technics including observability and controllability of the system and develop design rules for PI controller. Stability conditions are stated for operation point of the system. A fuzzy rule-based control system are developed from a PI controller using a inference machine based on Mandami operators. The fuzzy logic is applied to develop a specialist system that selects PCP equipments too. The developed technics to simulate and the linearized model was used in an actual well where a control system is installed. This control system consists of a pump intake pressure sensor, an industrial controller and a variable speed drive. The PI control was applied and fuzzy controller was applied to optimize simulated and actual well operation and the results was compared. The simulated and actual open loop response was compared to validate simulation. A case study was accomplished to validate equipment selection specialist system
dc.publisherUniversidade Federal do Rio Grande do Norte
dc.publisherBR
dc.publisherUFRN
dc.publisherPrograma de Pós-Graduação em Engenharia Elétrica
dc.publisherAutomação e Sistemas; Engenharia de Computação; Telecomunicações
dc.rightsAcesso Aberto
dc.subjectControle de Processo
dc.subjectControle fuzzy
dc.subjectElevação Arti&#64257
dc.subjectcial de Petróleo
dc.subjectBombeio por Cavidades Progressivas
dc.subjectSistema especialista
dc.subjectInteligent Automatic Control
dc.subjectArti&#64257
dc.subjectcial Lift
dc.subjectProgressing Cavity
dc.subjectEspecialist System
dc.subjectSimulator
dc.subjectFuzzy Logic
dc.titleEstudo de estratégias de otimização para poços de petróleo com elevação por bombeio de cavidades progressivas
dc.typedoctoralThesis


Este ítem pertenece a la siguiente institución