dc.contributorUniversidade Estadual Paulista (Unesp)
dc.contributorUNIZAR Univ Zaragoza
dc.date.accessioned2014-05-20T13:29:11Z
dc.date.accessioned2022-10-05T13:28:05Z
dc.date.available2014-05-20T13:29:11Z
dc.date.available2022-10-05T13:28:05Z
dc.date.created2014-05-20T13:29:11Z
dc.date.issued2011-10-01
dc.identifierElectric Power Systems Research. Lausanne: Elsevier B.V. Sa, v. 81, n. 10, p. 1866-1873, 2011.
dc.identifier0378-7796
dc.identifierhttp://hdl.handle.net/11449/9818
dc.identifier10.1016/j.epsr.2011.05.006
dc.identifierWOS:000294581300002
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/3886091
dc.description.abstractSome important real-time tasks of the independent system operator (ISO) are the monitoring and control of power system events (load deviations and contingencies). These events are usually managed by the ISO using operating reserve ancillary services. These services represent an additional capacity (MW) available in generators and some interruptible loads. Generators must change their operating points in order that this capacity can remain available. These changes might lead to efficiency losses in energy production. In systems with a high percentage of hydroelectric production, hydroelectric plants need to know the impact of ancillary services on their profits. This work therefore analyzes the cost of efficiency losses due to operating reserve availability in hydroelectric generators. A method to calculate this cost component is proposed using a unit commitment dispatch for a single hydroelectric plant. This dispatch is performed without considering the operating reserve availability and is compared with the traditional dispatch, which takes into account the availability of operating reserve. The proposal is used to calculate the cost of efficiency losses on a Brazilian hydroelectric generator. We found that the cost of efficiency losses can be considerable when compared to the incomes of a hydroelectric plant in the short-term market. (C) 2011 Elsevier B.V. All rights reserved.
dc.languageeng
dc.publisherElsevier B.V. Sa
dc.relationElectric Power Systems Research
dc.relation2.856
dc.relation1,048
dc.rightsAcesso restrito
dc.sourceWeb of Science
dc.subjectAncillary services
dc.subjectEfficiency losses
dc.subjectHydroelectric generators
dc.subjectOperating reserve
dc.titleCost assessment of efficiency losses in hydroelectric plants
dc.typeArtigo


Este ítem pertenece a la siguiente institución