dc.creatorSantos, Mírian Caroline Farias
dc.creatorCosta, Dayana Bastos
dc.creatorFerreira, Emerson de Andrade Marques
dc.date2021-03-12
dc.date.accessioned2022-10-04T22:08:34Z
dc.date.available2022-10-04T22:08:34Z
dc.identifierhttps://seer.ufrgs.br/index.php/ambienteconstruido/article/view/105064
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/3869316
dc.descriptionAlthough many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an information workflow that integrates 3D BIM modeling, cost estimating, scheduling, and monitoring processes in SMEs (ICSM Information Workflow). This research adopts the design science research approach, which includes (a) a literature review and a study of the information workflow among the processes, (b) a proposal of an information workflow based on certain assumptions for integration, (c) a participatory process for testing and adapting the proposed workflow, and (d) an evaluation of the proposed information workflow. The results indicate the participatory and cyclical processes that were proposed to define the work packages using a standard WBS and a database for information integration were the key for integrating people, technologies, and processes. The main contributions of this study are the proposal of an information workflow that integrates cost estimating, scheduling, and monitoring with BIM in SMEs, and the lessons learned based on the pilot test and evaluation of the ICSM Information Workflow in one of the two projects studied.en-US
dc.languageeng
dc.publisherANTAC - Associação Nacional de Tecnologia do Ambiente Construídopt-BR
dc.relationhttps://seer.ufrgs.br/index.php/ambienteconstruido/article/view/105064/60991
dc.rightsCopyright (c) 2021 Ambiente Construídopt-BR
dc.sourceAmbiente Construído; Vol. 21 No. 2 (2021); 113-129en-US
dc.sourceAmbiente Construído; Vol. 21 Núm. 2 (2021); 113-129es-ES
dc.sourceAmbiente Construído; v. 21 n. 2 (2021); 113-129pt-BR
dc.source1678-8621
dc.source1415-8876
dc.subjectIntegrationen-US
dc.subjectWorkflowen-US
dc.subjectCost estimatingen-US
dc.subjectSchedulingen-US
dc.subjectMonitoringen-US
dc.subjectBIMen-US
dc.titleInformation workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEsen-US
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion


Este ítem pertenece a la siguiente institución