dc.contributorPaulo Roberto Pereira Andery
dc.contributorEduardo Romeiro Filho
dc.contributorMarcos Martins Borges
dc.creatorPriscilla Meireles de Oliveira
dc.date.accessioned2019-08-09T16:13:25Z
dc.date.accessioned2022-10-04T00:59:08Z
dc.date.available2019-08-09T16:13:25Z
dc.date.available2022-10-04T00:59:08Z
dc.date.created2019-08-09T16:13:25Z
dc.date.issued2016-04-11
dc.identifierhttp://hdl.handle.net/1843/BUBD-AFJM99
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/3838009
dc.description.abstractMining Project Management, generally considered complex, often hasperformance problems associated with the deadlines to start operation, commonly postponed. In this sense, one of the major bottlenecks considered critical for mining projects schedules is the environmental licensing. This work discusses an exploratory study, focusing on the state of Minas Gerais, Brazil, related to projects development that uses the Front End Loading (FEL) methodology, evaluating the procedures and main engineering products generated, correlating them to theenvironmental licensing process. The research was developed through exploratory case study, based on the analysis of the documents relating to 355 environmental licensing processes formalized in the mining licensing agency by 14 companies in this segment. Two projects, which use Front End Loading methodology in the development phase, were selected for detailed analysis, focusing on the main activities carried out in the process and the impacts on environmental licensing, diagnosing problems and proposing solutions. The main results of this analysis arethe long term demanded for obtaining licenses, higher than expected inenvironmental legislation, affecting the schedules of the projects; the high incidence of additional information requested by the environmental agency; identification of the main aspects that can impact the licensing process; generation of draft checklist to be applied to the licensing process before its protocol and changes in the flow adopted by the company for projects that use this methodology in its management, including early delivery of engineering products.
dc.publisherUniversidade Federal de Minas Gerais
dc.publisherUFMG
dc.rightsAcesso Aberto
dc.subjectAmbiental
dc.subjectGerenciamento de Projetos
dc.subjectLicenciamento
dc.subjectFront End Loading
dc.subjectMineração
dc.titleAnálise do desenvolvimento de projetos de capital face ao processo de licenciamento ambiental: estudos de caso em projetos de mineração
dc.typeDissertação de Mestrado