dc.contributorFigueroa-Garcia J.C.
dc.contributorLopez-Santana E.R.
dc.contributorFerro-Escobar R.
dc.contributorVilla Ramírez, José Luis
dc.creatorOspina-Mateus H.
dc.creatorAcevedo Chedid, Jaime
dc.creatorSalas-Navarro K.
dc.creatorMorales-Londoño N.
dc.creatorMontero-Perez J.
dc.date.accessioned2020-03-26T16:32:41Z
dc.date.available2020-03-26T16:32:41Z
dc.date.created2020-03-26T16:32:41Z
dc.date.issued2017
dc.identifierCommunications in Computer and Information Science; Vol. 742, pp. 544-555
dc.identifier9783319669625
dc.identifier18650929
dc.identifierhttps://hdl.handle.net/20.500.12585/8971
dc.identifier10.1007/978-3-319-66963-2_48
dc.identifierUniversidad Tecnológica de Bolívar
dc.identifierRepositorio UTB
dc.identifier57194034904
dc.identifier57193533853
dc.identifier57193504630
dc.identifier57195913974
dc.identifier57195913794
dc.description.abstractActivities in mining complexes contain multiple decisions that affect the operations of the system for the extraction, transformation, transport and storage of various subsoil components. The purpose of this research is the planning of continuous flow production systems for mixed products, in non-metallic mining extraction processes, considering bottlenecks and capacity planning. This paper presents a model for production, based on mathematical optimization, that facilitates the planning and management of operations in the area of extraction, crushing and transformation of a quarry of aggregates for construction, considering the resources and the constraints that allow to define effective strategies in the increase of the productivity of the lines of low production environment by scenarios. This research develops an analysis of bottlenecks and contrasts the nature of the production system by means of a mathematical model of optimization, which considers the capacities and balances in the flows of the Limestone production line. The mathematical model that maximizes profits can be adapted to systems of continuous flow production in mining complexes where their products are part of a reverse logistics process, analysis of alternatives of extraction, transformation and transport. © 2017, Springer International Publishing AG.
dc.languageeng
dc.publisherSpringer Verlag
dc.relation27 September 2017 through 29 September 2017
dc.rightshttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.rightsinfo:eu-repo/semantics/restrictedAccess
dc.rightsAtribución-NoComercial 4.0 Internacional
dc.sourcehttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85030026163&doi=10.1007%2f978-3-319-66963-2_48&partnerID=40&md5=69e12f108d5403ea88f358f73f7aad08
dc.source4th Workshop on Engineering Applications, WEA 2017
dc.titleModel of optimization of mining complex for the planning of flow of quarry production of limestone in multiple products and with elements for the analysis of the capacity


Este ítem pertenece a la siguiente institución