dc.contributorSoacha Ortega, Adriana del Pilar
dc.contributorhttps://orcid.org/0000-0001-9288-8753
dc.contributorhttps://scholar.google.com/citations?user=qk_usrYAAAAJ&hl=es
dc.contributorUniversidad Santo Tomás
dc.creatorVergara Barreto, Jesús David
dc.creatorSánchez Gilede, Juan Carlos
dc.date.accessioned2022-01-18T15:38:06Z
dc.date.available2022-01-18T15:38:06Z
dc.date.created2022-01-18T15:38:06Z
dc.date.issued2021-12-22
dc.identifierSánchez Gilede, J. C. & Vergara Barreto, J. D. (2021). Análisis de la viabilidad técnica y financiera de una muestra de proyectos de Estudios y Diseños del IDU. [Trabajo de maestría, Universidad Santo Tomás]. Repositorio institucional.
dc.identifierhttp://hdl.handle.net/11634/38843
dc.identifierreponame:Repositorio Institucional Universidad Santo Tomás
dc.identifierinstname:Universidad Santo Tomás
dc.identifierrepourl:https://repository.usta.edu.co
dc.description.abstractThe main objective of this study was to analyze the technical and financial viability of a significant sample of Study and Design contracts, developed by the Urban Development Institute (IDU) during the years 2014 and 2019. That is why a survey was conducted of sector perception to Contractors of the Entity to know the most relevant facts that occurred in the development of 38 projects. Indeed, aspects related to duration, cost overruns, payments, technical and financial shortcomings, District Service Companies and Entities, non-compliance, sanctioning processes and the image of the Entity before the consulting union stand out. Also, the technical and financial information concerning three (3) Study and Design contracts, entered between the Urban Development Institute (IDU) and a consulting company in the country, was studied in greater detail. The foregoing was carried out supported by the information consigned in the Electronic System for Public Procurement (SECOP), which is the official information medium in Colombia for contracting carried out with public money. Similarly, the presumed causes and effects of the problems evidenced in the development of the contracts under study were identified, making use of financial indicators such as NPV and IRR. Finally, a methodology was proposed that serves as a tool for the Consultant union in evaluating the problems and risks that could be generated when entering contracts with the Urban Development Institute (IDU). In detail, the methodology focuses on the analysis of the proposals offered and takes as a reference the modifications presented to the specifications of the 38 projects studied in the development of the research. The applied methodology allowed to know the technical and financial factors that affected the viability of the selected sample of contracts. In summary, technical factors stand out as inadequate deadlines, scope extensions, deficiencies in previous studies, lack of articulation between entities, and failures in project management and coordination, and as financial factors the low values of the Studies and Designs, the unfunded delays of the Entities, the modifications of the quantities, the scope changes, and the contractors without cash flow.
dc.languagespa
dc.publisherUniversidad Santo Tomás
dc.publisherMaestría Infraestructura Vial
dc.publisherFacultad de Ingeniería Civil
dc.relationAcosta, D., & Rojas, L. (2017). Análisis del factor multiplicador dentro del presupuesto de la consultoría en Colombia. Universidad Pontificia Bolivariana. Retrieved from https://biblioteca.bucaramanga.upb.edu.co/docs/digital_34996.pdf
dc.relationAgencia Nacional de Contratación Pública. (2021). SECOP. Retrieved from https://colombiacompra.gov.co/secop/secop
dc.relationAlférez, J., Ramíez, O., & Hernández, W. (2019). La importancia de los estudios y documentos previos dentro de los contratos estatales de obra pública en Colombia. Retrieved from https://hdl.handle.net/10901/15761
dc.relationAl-Hazim, N., Salem, Z. A., & Ahmad, H. (2017). Delay and cost overrun in infrastructure projects in Jordan. Procedia Engineering, 182, 18-24. Doi:10.1016/j.proeng.2017.03.105
dc.relationAndrade, A. (2021). Análisis del ROA, ROE y ROI. Gaceta Jurídica). Retrieved from http://hdl.handle.net/10757/608313
dc.relationAndrić, J. M., Mahamadu, A., Wang, J., Zou, P. X. W., & Zhong, R. (2019). The cost performance and causes of overruns in infrastructure development projects in Asia. Journal of Civil Engineering and Management, 25(3), 203-214. Doi:10.3846/jcem.2019.8646
dc.relationANIF. (2014). Concesiones de infraestructura de cuarta generación (4G): Requerimientos de inversión y financiamiento público-privado. Retrieved from https://infraestructura.org.co/bibliotecas/DAE/Concesiones%20de%20Infraestructura.pdf
dc.relationArdila, P. (2018). Análisis de la constructabilidad con oportunidad de mejora en los procesos de planeación y ejecución en proyectos de construcción de infraestructura vial en Bogotá. Universidad La Gran Colombia. Retrieved from http://repository.ugc.edu.co/handle/11396/4058
dc.relationAyala, S., & Fino, G. (2015). CONTABILIDAD BÁSICA GENERAL un enfoque administrativo y de control interno LIBRO I. Bogotá, D. C., Colombia: Corporación Universitaria Republicana. Retrieved from https://urepublicana.edu.co/images/libros_pdf/978-958-5447-21-9.pdf
dc.relationBravo, J. (2015). Financiación de proyectos de infraestructura vial de cuarta generación (4G) en Colombia. Universidad de los Andes. http://hdl.handle.net/1992/13174
dc.relationCámara Colombiana de la Infraestructura. (2018). Encuesta de percepción sectorial 2018. Retrieved from https://site.infraestructura.co/sites/default/files/camara-resourse/documentos/estudios/Encuesta%20de%20Percepci%C3%B3n%20Sectorial%202018.pdf
dc.relationCámara Colombiana de la Infraestructura, & Instituto de Desarrollo Urbano. (2020). Gestión contractual IDU: Acuerdos mesa de trabajo. Retrieved from http://www.infraestructura.org.co/asuntos-bogota/IDU2020/presentacion-acuerdos-IDU.pdf
dc.relationChong, U., & Hopkins, O. (2016). An international experience on the evolution of road costs during the project life cycle. Transport Policy, 48, 60-66. Doi:org/10.1016/j.tranpol.2016.02.010
dc.relationClavijo, H., Álzate, M., & Mantilla, L. (2015). Análisis del sector de infraestructura en Colombia. Retrieved from http://aprendiendo.colombialider.org/wp-content/uploads/2018/04/PMIBogota-Analisis-sobre-el-sector-de-infraestructura-en-Colombia.pdf
dc.relationContraloría. (2016). Informe de auditoría de regularidad N°93. Retrieved from http://www.contraloriabogota.gov.co/sites/default/files/Contenido/Informes/Auditoria/Direcci%C3%B3n%20Sector%20Movilidad/PAD_2017/JL-DC/Regularidad/R_IDU_CODIGO93.pdf
dc.relationContraloría. (2019). Informe final de auditoría de regularidad N°66: Instituto de desarrollo urbano IDU. Retrieved from http://www.contraloriabogota.gov.co/sites/default/files/Contenido/Informes/Auditoria/Direcci%C3%B3n%20Sector%20Movilidad/PAD_2019/EN-JN/Regularidad/R_IDU_CODIGO66.pdf
dc.relationDoloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479-489. Doi:10.1016/j.ijproman.2011.10.004
dc.relationEl-Sayegh, S., & Mansour, M. (2015). Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering, 31(6). Doi:org/10.1061/(ASCE)ME.1943-5479.0000365
dc.relationFazekas, M., & Tóth, B. (2018). The extent and cost of corruption in transport infrastructure. New evidence from Europe. Transportation Research Part A: Policy and Practice, 113, 35-54. Doi:org/10.1016/j.tra.2018.03.021
dc.relationFlórez, M. (2020). La vigilancia y seguimiento al contrato de consultoría: Revisión de un caso práctico Retrieved from http://hdl.handle.net/1992/48498
dc.relationFlyvbjerg, B., Skamris, M., & Buhl, S. (2010). How common and how large are cost overruns in transport infrastructure projects? Transport Reviews, 23(1). Doi:org/10.1080/01441640309904
dc.relationForcada, N., Rusiñol, G., Macarulla, M., & E. D. Love, Peter E. (2014). Rework in highway projects. Journal of Civil Engineering and Management, 20(4). Doi:org/10.3846/13923730.2014.893917
dc.relationGunaruwan, T. (2016). Economics of public capital expenditure in the Sri Lankan Road infrastructure sector. Sri Lanka Journal of Economic Research, 4(1), 75-90. Doi:10.4038/sljer.v4i1.72
dc.relationHarrison, G., & Ohis, C. (2019). Comparative assessment of construction cost overruns: A case study of regional distribution in Ghana. African Journal of Science, Technology, Innovation and Development, 12, 123-126. Doi:org/10.1080/20421338.2019.1610251
dc.relationHosani, I., Dweiri, F., & Ojiako, U. (2020). A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates. International Journal of System Assurance Engineering and Management, 11(6), 1250-1259. Doi:10.1007/s13198-020-00979-8
dc.relationInstituto de Desarrollo Urbano. (2018a). Estructuración de contratos. Retrieved from https://www.idu.gov.co/page/planificacion-de-proyectos
dc.relationInstituto de Desarrollo Urbano. (2018b). Guía "alcance de los entregables en la etapa de diseño"
dc.relationInstituto de Desarrollo Urbano. (2020). Estudio económico del sector de la consultoría: Estudios y diseños de la calzada norte de la avenida la sirena (calle 153) entre la Autopista Norte y la Avenida Boyacá en la ciudad de Bogotá.
dc.relationLee, J. (2008). Cost overrun and cause in Korean social overhead capital projects: Roads, rails, airports, and ports. Journal of Urban Planning and Development, 134(2). Doi.org/10.1061/(ASCE)0733-9488(2008)134:2(59)
dc.relationLiu, H., Jiang, C., Liu, Y., Hertogh, M. J. C. M, & Lyu, X. (2018). Optimism bias evaluation and decision-making risk forecast on bridge project cost based on reference class forecasting: Evidence from China. Sustainability (Basel, Switzerland), 10(11). Doi:10.3390/su10113981
dc.relationLocatelli, G., Mariani, G., Sainati, T., & Greco, M. (2017). Corruption in public projects and megaprojects: There is an elephant in the room. International Journal of Project Management, 35(3), 252-268. Doi:10.1016/j.ijproman.2016.09.010
dc.relationLópez-Roldán, P., & Fachelli, S. (2015). Metodología de la investigación social cuantitativa. Bellaterra: Universitat Autònoma de Barcelona. Retrieved from http://ddd.uab.cat/record/129382
dc.relationLove, P., Sing, M., Ika, L., & Newton, S. (2019). The cost performance of transportation projects: The fallacy of the planning fallacy account. Transportation Research Part A: Policy and Practice, 122, 1-20. Doi:org/10.1016/j.tra.2019.02.004
dc.relationLozano, S., Patiño, I., Gómez-Cabrera, A., & Torres, A. (2018). Identificación de factores que generan diferencias de tiempo y costos en proyectos de construcción en Colombia. Ingeniería Y Ciencia (Medellín, Colombia), 14(27), 117-151. Doi:10.17230/ingciencia.14.27.6
dc.relationMeléndez, M. (2017). Corrupción y contratación pública: Problemas y soluciones. Razonpublica.Com, Retrieved from https://razonpublica.com/corrupcion-y-contratacion-publica-problemas-y-soluciones/
dc.relationMorín, E., & Alvarado, L. (2017). Boletín número V. Retrieved from https://www.cepep.gob.mx/work/models/CEPEP/metodologias/boletines/indicadores_rentabilidad.pdf
dc.relationMuñoz, F., Gutiérrez, L., & Gómez, C. (2017). La trasgresión al principio de planeación y sus consecuencias. Universidad Libre, Retrieved from https://hdl.handle.net/10901/16824
dc.relationOdeck, J. (2004). Cost overruns in road construction—what are their sizes and determinants? Transport Policy, 11(1), 43-53. Doi:10.1016/S0967-070X(03)00017-9
dc.relationOdeck, J. (2017). Variation in cost overruns of transportation projects: An econometric meta-regression analysis of studies reported in the literature. Transportation, 1345-1368. Doi:org/10.1007/s11116-017-9836-5
dc.relationOdeck, J., Welde, M., & Volden, G. (2015). The impact of external quality assurance of costs estimates on cost overruns: Empirical evidence from the Norwegian road sector. European Journal of Transport and Infrastructure Research, 15(3), 286-303. Doi:org/10.18757/ejtir.2015.15.3.3079
dc.relationParikh, D., Joshi, G., & Patel, D. (2019). Development of prediction models for claim cause analyses in highway projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 11(4). Doi:10.1061/(asce)la.1943-4170.0000303
dc.relationPinheiro, F., Oliveira, C., & Miranda, J. (2019). The determinants of cost deviations and overruns in transport projects, an endogenous models approach. Transport Policy, 74, 224-238. Doi:10.1016/j.tranpol.2018.12.008
dc.relationPiraquive, G., Matamoros, M., Cespedes, E., & Rodríguez, J. (2018). Actualización de la tasa de rendimiento del capital en Colombia bajo la metodología de Harberger. DNP. Retrieved from https://colaboracion.dnp.gov.co/CDT/Estudios%20Econmicos/487.pdf
dc.relationPricewaterhouseCoopers. (2016). Benchamarking de salarios: Tarifas de consultoría y cálculo factor multiplicador del sector. Retrieved from https://www.infraestructura.org.co/descargas/BenchMarking.pdf
dc.relationVásquez, A. (2015). Una propuesta para centralizar la contratación pública de infraestructura vial en Bogotá D.C. Universidad Militar Nueva Granada. Retrieved from http://hdl.handle.net/10654/7435
dc.relationVásquez, J. (2018). Algunos problemas "públicos" de la contratación estatal en Colombia como componentes del enfoque de ciclo para la formulación de una política pública. Prolegómenos, 21(41), 79-98. Doi:10.18359/prole.3331
dc.relationVeeduría Distrital. (2017). Lecciones aprendidas sobre la construcción del deprimido de la calle 94 (noviembre 2009 – febrero 2017). Retrieved from http://veeduriadistrital.gov.co/content/Informes-2017
dc.rightshttp://creativecommons.org/licenses/by-nc-nd/2.5/co/
dc.rightsAbierto (Texto Completo)
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rightshttp://purl.org/coar/access_right/c_abf2
dc.rightsAtribución-NoComercial-SinDerivadas 2.5 Colombia
dc.titleAnálisis de la viabilidad técnica y financiera de una muestra de proyectos de estudios y diseños del IDU.