dc.contributor | Villarreal Navarro, Julio Ernesto | |
dc.contributor | Vanegas Rendón, Laura Cristina | |
dc.contributor | Ábrego Pérez, Adriana Lourdes | |
dc.contributor | Cortés Guerrero, Camilo Andrés | |
dc.creator | Valero Sánchez, María Fernanda | |
dc.date.accessioned | 2021-11-03T16:19:09Z | |
dc.date.available | 2021-11-03T16:19:09Z | |
dc.date.created | 2021-11-03T16:19:09Z | |
dc.date.issued | 2021 | |
dc.identifier | http://hdl.handle.net/1992/53345 | |
dc.identifier | instname:Universidad de los Andes | |
dc.identifier | reponame:Repositorio Institucional Séneca | |
dc.identifier | repourl:https://repositorio.uniandes.edu.co/ | |
dc.description.abstract | En el presente documento se expone un análisis financiero para la implementación de Sistemas de Almacenamiento de Energía con Baterías (SAEB) en Colombia. Inicialmente se realiza un revisión bibliográfica de la implementación internacional de los SAEB, sus servicios y aplicaciones más comunes, con el fin de determinar el campo en el que podrían funcionar los sistemas en Colombia una vez definidos los estándares regulatorios para su aplicación. Posteriormente, mediante un análisis teórico se especifica la metodología que se va a utilizar para la valoración financiera durante este trabajo. Seguido a esto, es posible definir los parámetros, las fuentes y consideraciones que se utilizaron para realizar el modelo financiero de los SAEB bajo la regulación actual colombiana, es decir en el marco de la Convocatoria Pública UPME STR 01 ? 2021. No obstante, a partir de la elaboración del Flujo de Caja Libre para la convocatoria, también fue posible analizar la implementación paralela de actividades complementarias como la Regulación Secundaria de Frecuencia (AGC) y el arbitraje. Por último, se realiza un análisis de sensibilidad con el fin de identificar la robustez del modelo, así como las variables de mayor influencia. Se resalta de las conclusiones que al analizar los resultados obtenidos se tiene que para el mercado colombiano la actividad complementaria Regulación Secundaria de Frecuencia es la que presenta una viabilidad financiera, a diferencia del arbitraje. Igualmente, se concluye que modelo construido es muy robusto ante cambios en los parámetros y supuestos. Finalmente, es importante resaltar que para evaluar los resultados del modelo financiero de la convocatoria sería necesario realizar un ejercicio de comparación frente a otras ofertas; más que todo con el fin de determinar que tanta diferencia presentan dichos resultados prácticos ante una construcción puramente teórica. | |
dc.description.abstract | This document presents a financial analysis for the implementation Electric Energy Storage Systems (EESS) with Batteries in Colombia. Initially, a literature review of the international implementation of the EESS with batteries, its most common services and applications, is carried out in order to determine the field in which the systems could work in Colombia once the regulatory standards for their application have been defined. Subsequently, a theoretical analysis specifies the methodology to be used for financial valuation during this work. Following this, it is possible to define the parameters, sources and considerations that were used to make the financial model of the EESS with batteries under the current Colombian regulation, that is, within the framework of the Convocatoria Pública UPME STR 01 - 2021. However, from the elaboration of the Free Cash Flow for the tender, it was also possible to analyze the parallel implementation of complementary activities such as the Secondary Frequency Regulation and Electric energy time-shift (arbitrage). Finally, a sensitivity analysis is performed to identify the robustness of the model, as well as the variables of greatest influence. It is highlighted from the conclusions that when analyzing the results obtained, it is necessary that for the Colombian market the complementary activity Secondary Frequency Regulation is the one that presents a financial viability, unlike arbitration. Likewise, it is concluded that the built model is very robust in the face of changes in parameters and assumptions. Finally, it is important to highlight that to evaluate the results of the financial model of the call it would be necessary to carry out a comparison exercise against other offers; above all to determine how much difference these practical results present before a purely theoretical construction. | |
dc.language | spa | |
dc.publisher | Universidad de los Andes | |
dc.publisher | Maestría en Ingeniería Industrial | |
dc.publisher | Facultad de Ingeniería | |
dc.publisher | Departamento de Ingeniería Industrial | |
dc.rights | Al consultar y hacer uso de este recurso, está aceptando las condiciones de uso establecidas por los autores. | |
dc.rights | https://repositorio.uniandes.edu.co/static/pdf/aceptacion_uso_es.pdf | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | http://purl.org/coar/access_right/c_abf2 | |
dc.title | Modelaje financiero de un Sistema de Almacenamiento de Energía Eléctrica con Baterías (SAEB) para dar soporte a un sistema hidro-dependiente como el colombiano | |
dc.type | Trabajo de grado - Maestría | |