dc.contributorCosta, Miguel Antonio Bueno da
dc.contributorhttp://genos.cnpq.br:12010/dwlattes/owa/prc_imp_cv_int?f_cod=K4783799T7
dc.contributorhttp://lattes.cnpq.br/6148011136943940
dc.creatorPereira, Carla Roberta
dc.date.accessioned2011-04-20
dc.date.accessioned2016-06-02T19:51:49Z
dc.date.available2011-04-20
dc.date.available2016-06-02T19:51:49Z
dc.date.created2011-04-20
dc.date.created2016-06-02T19:51:49Z
dc.date.issued2011-02-18
dc.identifierPEREIRA, Carla Roberta. Um modelo de simulação de sistemas aplicado à programação da produção de um frigorífico de peixe. 2011. 144 f. Dissertação (Mestrado em Ciências Exatas e da Terra) - Universidade Federal de São Carlos, São Carlos, 2011.
dc.identifierhttps://repositorio.ufscar.br/handle/ufscar/3661
dc.description.abstractThe necessity for making production processes more efficient and effective is the desire of any organization. For this to become reality and does not generate high investment is necessary to use techniques that assist in improvement of the production process along with a appropriate schedule of productive resources. Among these techniques, the Simulation assists effectively those improvements, because it seeks to import the reality for a controlled environment, under several conditions, without physical risks and/or high costs involved. This technique becomes even more useful in growing markets, such as the tilapiculture. With the emergence of new fish processing facility, it is necessary a better organization in order to produce more adequately, serving its clients satisfactorily and expanding its business. Thus, the main purpose of this study was to develop a simulation model to assist the decision making about the production scheduling of a fish processing facility, located in the Sao Paulo state. To this end, it used as computational tool the software Arena, by Rockwell Software, and as research method the modeling and simulation, including in this the methodology SimuCAD and the development phases of a simulation model discussed by Banks (1998) and Law and Kelton (2000). With the construction of the model was able to work several alternative scenarios, testing different working hours, types of flows and production capacity, besides variations of the ending inventory in relation to sales. As result, it obtained a useful and differentiated model simulation to assist the decision making about production scheduling of fish processing facility studied, besides reducing the lead-time process and attending all the specific objectives established. At the end of this study, proposals for future research were suggested.
dc.publisherUniversidade Federal de São Carlos
dc.publisherBR
dc.publisherUFSCar
dc.publisherPrograma de Pós-Graduação em Engenharia de Produção - PPGEP
dc.rightsAcesso Aberto
dc.subjectSimulação
dc.subjectProgramação da produção
dc.subjectFrigoríficos
dc.subjectTilapicultura
dc.subjectSistemas de produção
dc.subjectFrigorífico de peixe
dc.subjectSoftware Arena
dc.subjectSimulation
dc.subjectProduction scheduling
dc.subjectFish processing facility
dc.subjectTilapiculture
dc.subjectProduction systems
dc.subjectSoftware Arena
dc.titleUm modelo de simulação de sistemas aplicado à programação da produção de um frigorífico de peixe
dc.typeTesis


Este ítem pertenece a la siguiente institución