Tesis
Influência da medição de desempenho nos projetos seis sigma : estudos de caso
Fecha
2007-06-01Registro en:
MERGULHÃO, Ricardo Coser. Influência da medição de desempenho nos projetos seis sigma : estudos de caso.. 2007. 233 f. Tese (Doutorado em Ciências Exatas e da Terra) - Universidade Federal de São Carlos, São Carlos, 2007.
Autor
Mergulhão, Ricardo Coser
Institución
Resumen
Six Sigma and performance measurement are subjects under investigation for
practical and academic purposes. In this way, Six Sigma Program is a remarkable continuous
improvement program with exceptional results in short term accomplished by Six Sigma Projects.
Like others improvement approaches, some factors can influence the results of these projects.
Beside this, the performance measurement plays an important role as a support to the continuous
improvement program, acting as its inhibiting or enabling mechanism. In this sense, the
performance measurement becomes a necessary condition to guarantee the success of Six Sigma
Projects. Nevertheless, a bibliography review has shown the non-existence of detailed academic
researches on these two topics, studied in the same work. Due to this, the objective of this thesis is
to investigate the influence of the performance measurement on Six Sigma Projects with the
intention of highlighting the factors found during the development of these projects. The
explanatory multiple case studies has chosen as the research method for this work. In order to
achieve the objective, a field research was conducted on five companies belong to different
industrial sectors. The empirical evidences have shown that developments of Six Sigma Projects
are influenced by different factors. Some of them were found in many companies. It was verified
also that the development of Six Sigma Projects affects the performance measurement, better said,
there is a reciprocal influence between Six Sigma Projects and performance measurement.
Establishing relationships between financial and non-financial performance measures is an
important issue to develop Six Sigma Projects, as observed, due to the financial orientation of Six
Sigma Projects. It means that the factor mentioned above has a great impact over other ones that
have also their influences on the development of Six Sigma Projects. At last, this thesis aimed a
contribution to the academic as well as to practical purposes since knowledge about factors that
rule the relationship between performance measurement and Six Sigma Projects can support the
construction of a framework related to both aspects and, then, reinforcing the benefits of the Six
Sigma Program.