dc.description.abstractThis study presents a new methodology based on risk/investment to solve transmission network expansion planning (TNEP) problem with multiple future scenarios. Three mathematical models related to TNEP problems considering multiple future generation and load scenarios are also presented. These models will provide planners with a meaningful risk assessment that enable them to determine the necessary funding for transmission lines at a permissible risk level. The results using test and real systems show that the proposed method presents better solutions compared with scenario analysis method. ©The Institution of Engineering and Technology 2013.
dc.languageeng
dc.relationIET Generation, Transmission and Distribution
dc.relation2.618
dc.relation0,907
dc.rightsAcesso restrito
dc.sourceScopus
dc.subjectFuture generations
dc.subjectReal systems
dc.subjectRisk levels
dc.subjectScenario analysis
dc.subjectTransmission expansion planning
dc.subjectTransmission network expansion planning
dc.subjectMathematical models
dc.subjectRisk assessment
dc.titleRisk/investment-driven transmission expansion planning with multiple scenarios