dc.creatorVecchietti, Aldo
dc.creatorRodriguez, Maria Analia
dc.date.accessioned2016-08-05T15:50:37Z
dc.date.accessioned2018-11-06T11:49:30Z
dc.date.available2016-08-05T15:50:37Z
dc.date.available2018-11-06T11:49:30Z
dc.date.created2016-08-05T15:50:37Z
dc.date.issued2013-01
dc.identifierVecchietti, Aldo; Rodriguez, Maria Analia; Integrated planning and scheduling with due dates in corrugated board boxes industry; American Chemical Society; Industrial & Engineering Chemical Research; 52; 2; 1-2013; 847-860
dc.identifier0888-5885
dc.identifierhttp://hdl.handle.net/11336/6951
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/1859911
dc.description.abstractAn integrated approach that solves the cutting stock problem and scheduling is considered in this article. The main challenging characteristics of this problem are given by its combinatorial nature, as well as the nonconvexities appearing in the formulation. Scheduling decisions are directly affected by cutting patterns and present changeover times that are sequence-dependent. Given the problem complexity, in general, cutting stock optimization has been considered independently from the scheduling problem. However, a cutting plan that defines the sequence in which patterns are processed is essential in order to obtain a solution in the context of corrugated board boxes industry. In order to obtain a global solution, the approach that has been developed uses a disjunctive technique to transform the original nonconvex formulation into a mixed-integer linear programming (MILP) model; whereas a continuous time representation is assumed to model sequencing decisions by applying general and immediate precedence constraints. Both scheduling models are presented and compared in three examples, showing efficient solutions for the integrated problem.
dc.languageeng
dc.publisherAmerican Chemical Society
dc.relationinfo:eu-repo/semantics/altIdentifier/url/http://pubs.acs.org/doi/abs/10.1021/ie302109j
dc.relationinfo:eu-repo/semantics/altIdentifier/doi/http://dx.doi.org/10.1021/ie302109j
dc.relationinfo:eu-repo/semantics/altIdentifier/doi/10.1021/ie302109j
dc.rightshttps://creativecommons.org/licenses/by-nc-sa/2.5/ar/
dc.rightsinfo:eu-repo/semantics/restrictedAccess
dc.subjectPLANNING
dc.subjectSCHEDULING
dc.subjectDUE DATES
dc.subjectBOARD BOXES
dc.titleIntegrated planning and scheduling with due dates in corrugated board boxes industry
dc.typeArtículos de revistas
dc.typeArtículos de revistas
dc.typeArtículos de revistas


Este ítem pertenece a la siguiente institución