dc.contributorDel-Valle-Granados, Ignacio
dc.creatorCamareno-Núñez, Mario José
dc.date.accessioned2017-03-17T21:44:44Z
dc.date.available2017-03-17T21:44:44Z
dc.date.created2017-03-17T21:44:44Z
dc.date.issued2016
dc.identifierhttps://hdl.handle.net/2238/6858
dc.description.abstractIn this specialty practice, it has developed a project that consists of two parts, both related. The technical part is in the mechanical area, more specifically in the area of thermal fluids and the other part is maintenance management. The technical part is calculating thermal load for air conditioning supply clinical laboratory, belonging to Maximiliano Peralta Jiménez Hospital, located in the central region of the province of Cartago. To start calculating thermal load several views of the enclosure were made to carry out a survey of the most important laboratory data such as building materials, electrical grid, space available, internal temperature, teams in each venue, number of people they are working in each enclosure and a check of air conditioning equipment currently installed. He proceeded to perform calculations based on ASHRAE, specifically in the volumes of ASHRAE Handbook HVAC design fundamentals and Manual for Hospital and Clinics. Enclosures have studied two are only installed ventilation, both extraction and injection of fresh air, this will be based on the national standard INTE 31-08-08-03. After calculating the thermal load, we proceeded to select the team, designing products, based on criteria of flow, sound and conduction losses air. Enclosures studied This was proposed a design that allows air conditioning make a budget to serve in receiving offers from different providers of air conditioning equipment. The administrative part is to make plans and preventive maintenance routines for air conditioning equipment and selected for the clinical laboratory ventilation. Finally, a financial analysis of the project will be made
dc.languagespa
dc.publisherInstituto Tecnológico de Costa Rica
dc.subjectVentilación
dc.subjectMantenimiento preventivo
dc.subjectAdministración
dc.subjectMecánica
dc.subjectTemperatura
dc.subjectEquipo
dc.subjectResearch Subject Categories::TECHNOLOGY::Engineering mechanics::Mechanical and thermal engineering
dc.titleCálculo de carga térmica para el suministro de aire acondicionado del laboratorio clínico y planes de mantenimiento preventivo para equipo de aire acondicionado clínico, Hospital Dr. Maximiliano Peralta Jiménez.
dc.typelicentiateThesis


Este ítem pertenece a la siguiente institución