Actas de congresos
A Nonlinear Model For The Long-term Hydro-thermal Generation Scheduling Problem Over Multiple Areas With Transmission Constraints
Registro en:
9781424438112
2009 Ieee/pes Power Systems Conference And Exposition, Psce 2009. , v. , n. , p. - , 2009.
10.1109/PSCE.2009.4840175
2-s2.0-70349165369
Autor
Martins L.S.A.
Soares S.
Azevedo A.T.
Institución
Resumen
This paper presents a nonlinear model with individual representation of plants for the centralized long-term hydrothermal scheduling problem over multiple areas. In addition to common aspects of long-term scheduling, this model takes transmission constraints into account. The ability to optimize hydropower exchange among multiple areas is important because it enables further minimization of complementary thermal generation costs. Also, by considering transmission constraints for long-term scheduling, a more precise coupling with shorter horizon schedules can be expected. This is an important characteristic from both operational and economic viewpoints. The proposed model is solved by a sequential quadratic programming approach in the form of a prototype system for different case studies. An analysis of the benefits provided by the model is also presented. ©2009 IEEE.
Labadie, J.W., Optimal operation of multireservoir systems: State-of-the-art review (2004) Journal of Water Resources Planning and Management, 130 (2), pp. 93-111 Dembo, R., Scenario optimization (1991) Annals of Operations Research, 30 (1), pp. 63-80 Nabona, N., Multicommodity network flow model for long-term hydro-generation optimization (1993) IEEE Transactions on Power Systems, 8 (2), pp. 395-404 Escudero, L., Pietro, F., Hydropower generation management under uncertainty via scenario analysis and parallel computation (1996) IEEE Transactions on Power Systems, 11 (2), pp. 683-689 Dagli, C.H., Miles, J.F., Determining operating policies for a water resource system (1980) Journal of Hydrology, 47, pp. 297-306 Martinez, L., Soares, S., Comparison between closed-loop and partial open-loop feedback control policies in long term hydrothermal scheduling (2002) IEEE Transactions on Power Systems, 17 (2), pp. 330-336 Barros, M., Tsai, F., S-L, L.Y., Yeh, W., Optimization of large-scale hydropower systems operations (2003) Journal of Water Resources Planning and Management, 129 (3), pp. 178-188 Gagnon, C., Hicks, R., Jacoby, S., Kowalik, J., A nonlinear programming approach to a very large hydroelectric system optimization (1974) IEEE Transactions on Power Systems, 6 (1), pp. 28-41 Rosenthal, R.E., A nonlinear network flow algorithm for maximization of benefits in a hydroelectric power system (1981) Operations Research, 29 (4), pp. 763-785 Carvalho, M.F., Soares, S., An efficient hydrothermal scheduling algorithm (1987) IEEE Transactions on Power Systems, PWRS-2 (3), pp. 537-542 Lyra, C., Tavares, H., A contribution to the midterm scheduling of large scale hydrothermal power systems (1988) IEEE Transactions on Power Systems, 3 (3), pp. 852-857 Oliveira, G.G., Soares, S., A second-order network flow algorithm for hydrothermal scheduling (1995) IEEE Transactions on Power Systems, 10 (3), pp. 1635-1641 Ponnambalam, K., Quintana, V.H., Vanelli, A., A fast algorithm for power system optimization problems using an interior point method (1996) IEEE Transactions on Power Systems, 7 (2), pp. 659-668 Christoforidis, M., Aganagic, M., Awobamise, B., Tong, S., Rahimi, A., Long-term/mid-term resource optimization of a hydro-dominant power system using interior point method (1996) IEEE Transactions on Power Systems, 11 (1), pp. 287-294 Medina, J., Quintana, V.H., Conejo, A.J., A clipping-off interior-point technique for medium-term hydro-thermal coordination (1999) IEEE Transactions on Power Systems, 14 (1), pp. 266-273 Gorenstein, B., Campodonico, N., Costa, J., Pereira, M., Stochastic optimization of a hydro-thermal system including network constraints (1992) IEEE Transactions on Power Systems, 7 (2), pp. 791-797 Piekutowski, M.R., Litwinowicz, T., Frowd, R., Optimal short-term scheduling for a large-scale cascaded hydrosystem (1993) Proc. Power Industry Computer Application Conference, 1, pp. 292-298. , Scottsdale, AZ Wang, C., Shahidehpour, S.M., Power generation scheduling for multi-area hydro-thermal systems with tie line constraints, cascaded reservoirs and uncertain data (1993) IEEE Transactions on Power Systems, 8 (3), pp. 1333-1340 Franco, P.E.C., Carvalho, M.F., Soares, S., A network flow model for short-term hydro-dominated hydrothermal scheduling problems (1994) IEEE Transactions on Power Systems, 9 (2), pp. 1016-1022 on Dams, W.C., Dams and development: A new framework for decision-making, (2000), Tech. RepCarvalho, M., Soares, S., Ohishi, T., Optimal active power dispatch by network flow approach (1988) IEEE Transactions on Power Systems, 3 (4), pp. 1640-1647 Oliveira, A.R.L., Soares, S., Nepomuceno, L., Optimal active power dispatch combining network flow and interior point approaches (2003) IEEE Transactions on Power Systems, 18 (4), pp. 1235-1240 Biggs, M.C., Constrained Minimization Using Recursive Quadratic Programming (1975) ser. Towards Global Optimization, pp. 341-349. , North-Holland Han, S.P., A globally convergent method for nonlinear programming (1977) Journal of Optimization Theory and Applications, 22 (3), pp. 297-309 Arvanitidis, N.V., Rosing, J., Composite representation of a multireservoir hydroelectric power system (1970) IEEE Transactions on Power Apparatus and Systems, PAS-89 (2), pp. 319-326