dc.creatorCarneiro J.C.
dc.creatorJardini J.A.
dc.creatorBrittes J.L.P.
dc.date2012
dc.date2015-06-25T20:27:01Z
dc.date2015-11-26T14:55:17Z
dc.date2015-06-25T20:27:01Z
dc.date2015-11-26T14:55:17Z
dc.date.accessioned2018-03-28T22:07:23Z
dc.date.available2018-03-28T22:07:23Z
dc.identifier9781467326711
dc.identifierProceedings Of The 2012 6th Ieee/pes Transmission And Distribution: Latin America Conference And Exposition, T And D-la 2012. , v. , n. , p. - , 2012.
dc.identifier
dc.identifier10.1109/TDC-LA.2012.6319123
dc.identifierhttp://www.scopus.com/inward/record.url?eid=2-s2.0-84869443809&partnerID=40&md5=91baf0b11988a363b3588c2f61601915
dc.identifierhttp://www.repositorio.unicamp.br/handle/REPOSIP/90638
dc.identifierhttp://repositorio.unicamp.br/jspui/handle/REPOSIP/90638
dc.identifier2-s2.0-84869443809
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/1255332
dc.descriptionThe main objective of this article is to propose a methodology for prioritizing actions in predictive maintenance substation equipment, applied to Power Transformers, which are eventually responsible for the income revenue of energy companies (generation, transmission and distribution). This is a reflection on the failure analysis and risk management with optimal use of predictive maintenance, to reduce or eliminate transformer shutdowns. Using statistical concepts, this proposal goes through various stages of application, and addresses power transformer differences (generation, transmission and distribution), aspects of life cycle, operation, maintenance, aging, depreciation, aspects of reliability, risk of failure and effectiveness of predictive techniques. The basic process concept lays on stratification and consolidation of data from studies in the area of reliability centered maintenance, combined with historical information, taking also into account the diagnosis on equipment condition based on monitoring and predictive concept. © 2012 IEEE.
dc.description
dc.description
dc.description
dc.description
dc.description IEEE Power and Energy Society,IEEE Uruguay Section
dc.descriptionCarneiro, J.C., Bini, M.A., Economic aspects in the management of transformers (2008) CPFL RDEEM Technical Study Report 2008-49
dc.description(2006) Study B03.01 Reliability Centered Maintenance Substation, , Cigré
dc.description(2008) Working Group A02.03 Monitoring of Power Transformers, , Cigré
dc.description(2008) Preventive Maintenance of Power Transformers, , Technical Guidance/CPFL 3405
dc.description(2007) Periodic Inspection of Substations and Related Facilities, , Technical Guidance/CPFL 3963
dc.descriptionCarneiro, J.C., Rapid diagnosis of incipient faults in transformer substations (2010) CPFL Study Technical Report 13989
dc.description(2005) Analysis and Diagnosis and Management of Predictive Maintenance of Transformers and Voltage Regulators and Substations, , Technical Guidance/CPFL 04096
dc.descriptionCarneiro, J.C., Aspects of moisture in the solid insulation of power transformers in substations (2010) CPFL Technical Report 14057, , Method of Duval
dc.descriptionVasconcelos, V., Alves, M., Moura, G., (2008) Monitoring of Moisture from Oil Power Transformers Aiming to Increase Reliability, , (CPFL).
dc.description(Treetech), (Treetech)
dc.descriptionSmith, I.P., Groups of reliability-centered maintenance case study of the electric sector (2006) CHESF
dc.descriptionCarneiro, J.C., Risk management of power transformers from substations to the explosions and fires Workshop / Working Group A2 Cigré 04 - Transformer Explosion and Fire, June 2011. Foz Do Iguaçu, PR (Itaipu Binational), , Presented at the
dc.languageen
dc.publisher
dc.relationProceedings of the 2012 6th IEEE/PES Transmission and Distribution: Latin America Conference and Exposition, T and D-LA 2012
dc.rightsfechado
dc.sourceScopus
dc.titleSubstation Power Transformer Risk Management: Reflecting On Reliability Centered Maintenance And Monitoring
dc.typeActas de congresos


Este ítem pertenece a la siguiente institución