dc.creator | Arce Encina A.S. | |
dc.creator | Filho S.S. | |
dc.creator | Ohishi T. | |
dc.creator | Cicogna M.A. | |
dc.date | 2008 | |
dc.date | 2015-06-30T19:19:38Z | |
dc.date | 2015-11-26T14:42:06Z | |
dc.date | 2015-06-30T19:19:38Z | |
dc.date | 2015-11-26T14:42:06Z | |
dc.date.accessioned | 2018-03-28T21:49:27Z | |
dc.date.available | 2018-03-28T21:49:27Z | |
dc.identifier | | |
dc.identifier | International Journal Of Emerging Electric Power Systems. , v. 9, n. 4, p. - , 2008. | |
dc.identifier | 1553779X | |
dc.identifier | | |
dc.identifier | http://www.scopus.com/inward/record.url?eid=2-s2.0-55549127576&partnerID=40&md5=6bfa0adb8b2bcab2ed05e264bee5c79c | |
dc.identifier | http://www.repositorio.unicamp.br/handle/REPOSIP/105770 | |
dc.identifier | http://repositorio.unicamp.br/jspui/handle/REPOSIP/105770 | |
dc.identifier | 2-s2.0-55549127576 | |
dc.identifier.uri | http://repositorioslatinoamericanos.uchile.cl/handle/2250/1251124 | |
dc.description | This paper is concerned with the unit commitment of hydro generating units on an hourly basis throughout a single day. A performance criterion that takes into consideration variations in tailrace elevation, penstock head loss and turbine-generator efficiency is suggested as the objective function for the optimization model. A heuristic procedure based on Lagrangian Relaxation was implemented to solve the problem. The approach was then tested on a system composed of sixteen hydro plants, one hundred generating units, and an installed capacity of 21,933 MW, in the Brazilian power system. The scheduling of generation verified for a typical day was used for comparison with the solution proposed by this procedure. The results show a significant improvement in terms of hydro conversion efficiency. © 2008 The Berkeley Electronic Press. All rights reserved. | |
dc.description | 9 | |
dc.description | 4 | |
dc.description | | |
dc.description | | |
dc.description | Yang, P., Yang, H., Huang, C., Scheduling short-term hydrothermal generation using evolutionary programming techniques (1996) IEE Proc.-Gener. Transm. Distrib, 143 (4). , July | |
dc.description | Li, C., Hsu, E., Svoboda, A., Tseng, C., Johnson, R., Hydro Unit Commitment in Hydrothermal Optimization (1997) IEEE Transaction on Power Systems, 12 (2), pp. 764-769. , May | |
dc.description | Nilsson, O., Sjelvgren, D., Variable Splitting Applied to Modelling of Start-Up Costs in Short Term Hydro Generation Scheduling (1997) IEEE Transaction on Power Systems, 12 (2), pp. 770-775. , May | |
dc.description | Soares, S., Salmazo, C., Minimum Loss Predispatch Model for Hydroelectric Power Systems (1997) IEEE Transactions on Power Systems, 12 (3), pp. 1220-1228. , August | |
dc.description | Guan, X., Ni, E., Li, R., Luh, P., An Optimization-Based Algorithm for Scheduling Hydrothermal Power Systems with Cascade Reservoirs and Discrete Hydro Constraints (1997) IEEE Transactions on Power Systems, 12 (4), pp. 1775-1780. , November | |
dc.description | Nilsson, O., Soder, L., Sjelvgren, D., Integer Modelling of Spinning Reserve Requirements in Short Term Scheduling of Hydro Systems (1998) IEEE Transaction on Power Systems, 13 (3), pp. 959-964. , August | |
dc.description | Arce, A., Ohishi, T., Soares, S., Optimal Dispatch of Generating units of the Itaipu Hydroelectric Plant (2002) IEEE Transactions on Power Systems, 17 (1), pp. 154-157. , February | |
dc.description | Conejo, A., Arroyo, J., Contreras, J., Villamor, F., Self-Scheduling of a Hydro Producer in a Pool-Based Electricity Market (2002) IEEE Transactions on Power Systems, 17 (4), pp. 1265-1272. , November | |
dc.description | Luemberger, D., (1984) Introduction to Linear and Non-Linear Programming, , Second Edition, Addison-Wesley, Reading, Mass | |
dc.language | en | |
dc.publisher | | |
dc.relation | International Journal of Emerging Electric Power Systems | |
dc.rights | fechado | |
dc.source | Scopus | |
dc.title | Unit Commitment Of Hydro Dominated Systems | |
dc.type | Artículos de revistas | |