dc.creatorToledo C.F.M.
dc.creatorFranca P.M.
dc.creatorMorabito R.
dc.creatorKimms A.
dc.date2007
dc.date2015-06-30T18:43:54Z
dc.date2015-11-26T14:32:53Z
dc.date2015-06-30T18:43:54Z
dc.date2015-11-26T14:32:53Z
dc.date.accessioned2018-03-28T21:36:17Z
dc.date.available2018-03-28T21:36:17Z
dc.identifier
dc.identifierPesquisa Operacional. , v. 27, n. 1, p. 155 - 186, 2007.
dc.identifier1017438
dc.identifier
dc.identifierhttp://www.scopus.com/inward/record.url?eid=2-s2.0-34547445625&partnerID=40&md5=2d68f7b248b313cb0d725aa175889456
dc.identifierhttp://www.repositorio.unicamp.br/handle/REPOSIP/104548
dc.identifierhttp://repositorio.unicamp.br/jspui/handle/REPOSIP/104548
dc.identifier2-s2.0-34547445625
dc.identifier.urihttp://repositorioslatinoamericanos.uchile.cl/handle/2250/1247725
dc.descriptionThe present paper establishes, describes mathematically and solves a multi-level lot sizing and scheduling problem in an industrial set with parallel machines and sequence-dependent setup cost and time, The problem is motivated by real situations found in some industrial settings mainly the soft drink industry. In this kind of industry, the production involves two interdependent levels with decisions about raw material storage and soft drink bottling, The several raw materials are stored in tanks from which they flow to the bottling lines. The challenge is to determine simultaneously the minimum cost lot sizing and scheduling of raw material in tanks and also in the bottling lines, where setup costs and time depend on the previous items stored and bottled. A mixed-integer mathematical model with several combined constrains that use to be handled apart in the literature is proposed. The lack of similar models led us to create a set of instances to evaluate the model and the solution techniques developed. The instances were optimally solved by the GAMS/Cplex software. Due to the problem complexity, it is demonstrated that the use of this optimization package is only viable for small-sized instances. The computational results are showed and analyzed.
dc.description27
dc.description1
dc.description155
dc.description186
dc.descriptionBitran, G.R., Matsuo, H., Approximation formulations for the single-product capacitated lot size problem (1986) Operations Research, 34, pp. 63-74
dc.descriptionCampbell, G.M., Using short-term dedication for scheduling multiple products on parallel machines (1992) Production and Ope rations Management, 1, pp. 295-307
dc.descriptionCarreno, J.J., Economic lot scheduling for multiple products on parallel identical processors (1990) Management Science, 36, pp. 348-358
dc.descriptionClark, A.R., Clark, S.J., Rolling-horizon lot-sizing when set-up times are sequence-dependent (2000) International Journal of Production Research, 38 (10), pp. 2287-2307
dc.descriptionDe Matta, R., Guignard, M., The performance of rolling production schedules in a process industry (1995) IIE Transactions, 27, pp. 564-573
dc.descriptionDrexl, A., Haase, K., Proportional lotsizing and scheduling (1995) International Journal of Production Economics, 40, pp. 73-87
dc.descriptionDrexl, A., Haase, K., Sequential-analysis based randomized-regret-methods for lot-sizing and scheduling (1996) Journal of the Operational Research Society, 47, pp. 251-265
dc.descriptionDrexl, A., Kimms, A., Lot sizing and scheduling - survey and extensions (1997) European Journal of Operational Research, 99, pp. 221-235
dc.descriptionFleischmann, B., The discrete lot-sizing and scheduling problem (1990) European Journal of Operational Research, 44, pp. 337-348
dc.descriptionFleischmann, B., The discrete lot-sizing and scheduling problem with sequence-dependent setup costs (1994) European Journal of Operational Research, 75, pp. 395-404
dc.descriptionFleischmann, B., Meyr, H., The general lotsizing and scheduling problem (1997) OR Spektrum, 19, pp. 11-21
dc.descriptionGupta, D., Magnusson, T., The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times (2005) Computer & Operations Research, 32, pp. 727-747
dc.descriptionHaase, K., Kimms, A., Lot sizing and scheduling with sequence dependent setup costs and times and efficient rescheduling opportunities (2000) International Journal of Production Economics, 66, pp. 159-169
dc.descriptionKang, S., Malik, K., Thomas, L.J., Lotsizing and scheduling on parallel machines with sequence-dependent setup costs (1999) Management Science, 45, pp. 273-289
dc.descriptionKarmakar, U.S., Kekre, S., The deterministic lotsizing problem with startup and reservation costs (1987) Operations Research, 35, pp. 389-398
dc.descriptionKimms, A., Demand Shuffle - A method for multi-level proportional lot sizing and scheduling (1997) Naval Research Logistics, 44, pp. 319-340
dc.descriptionKimms, A., (1997) Multi-level lot sizing and scheduling: Methods for capacitated, dynamic and deterministic models, , Physica-Verlag, Heidelberg
dc.descriptionKuhn, H., Quadt, D., Lot sizing and scheduling in semiconductor assembly - a hierarchical planning approach (2002) Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing, pp. 211-216. , edited by G.T. Mackulak, J.W. Fowler and A. Schömig, Tempe, USA
dc.descriptionMeyr, H., Simultaneous lotsizing and scheduling by combining local search with dual reoptimization (2000) European Journal of Operational Research, 120, pp. 311-326
dc.descriptionMeyr, H., Simultaneous lotsizing and scheduling on parallel machines (2002) European Journal of Operational Research, 139, pp. 277-292
dc.descriptionQuadt, D., Kuhn, H., (2003) Production planning in semiconductor assembly, , Working Paper, Catholic University of Eichstätt, Ingolstadt
dc.descriptionStadtler, H., Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing (1996) European Journal of Operational Research, 94, pp. 561-581
dc.descriptionTempelmeier, H., Derstroff, A., A lagrangean-based heuristic for dynamic multilevel multi-item constrained lotsizing with setup times (1996) Management Science, 42, pp. 738-757
dc.descriptionToledo, C.F.M., (2005), Problema conjunto de dimensionamento de lotes e programação da produção. Tese de Doutorado, Universidade Estadual de Campinas, Faculdade de Engenharia Elétrica
dc.languagept
dc.publisher
dc.relationPesquisa Operacional
dc.rightsaberto
dc.sourceScopus
dc.titleUm Modelo De Otimização Para O Problema Integrado De Dimensionamento De Lotes E Programação Da Produção Em Fábricas De Refrigerantes
dc.typeArtículos de revistas


Este ítem pertenece a la siguiente institución