dc.creator | da Cruz Jr. G. | |
dc.creator | Soares S. | |
dc.date | 1995 | |
dc.date | 2015-06-26T17:14:51Z | |
dc.date | 2015-11-26T14:20:51Z | |
dc.date | 2015-06-26T17:14:51Z | |
dc.date | 2015-11-26T14:20:51Z | |
dc.date.accessioned | 2018-03-28T21:22:33Z | |
dc.date.available | 2018-03-28T21:22:33Z | |
dc.identifier | | |
dc.identifier | Ieee Power Industry Computer Applications Conference. Ieee, Piscataway, Nj, United States, v. , n. , p. 566 - 571, 1995. | |
dc.identifier | | |
dc.identifier | | |
dc.identifier | http://www.scopus.com/inward/record.url?eid=2-s2.0-0029233551&partnerID=40&md5=f4592741a70000ed544ea567fda3566d | |
dc.identifier | http://www.repositorio.unicamp.br/handle/REPOSIP/96022 | |
dc.identifier | http://repositorio.unicamp.br/jspui/handle/REPOSIP/96022 | |
dc.identifier | 2-s2.0-0029233551 | |
dc.identifier.uri | http://repositorioslatinoamericanos.uchile.cl/handle/2250/1244359 | |
dc.description | This paper presents a non-uniform composite representation of hydroelectric systems for use in long-term hydrothermal scheduling. This representation was developed from reservoir operational rules based on optimal reservoir trajectories obtained with a deterministic hydrothermal scheduling algorithm. A test system consisting of 7 large hydroelectric plants of the Southeast Brazilian Power System with 12572 MW of installed power capacity was selected for a case study. Operational cost comparisons with the classical uniform composite representation reveal significant savings. | |
dc.description | | |
dc.description | | |
dc.description | 566 | |
dc.description | 571 | |
dc.language | en | |
dc.publisher | IEEE, Piscataway, NJ, United States | |
dc.relation | IEEE Power Industry Computer Applications Conference | |
dc.rights | fechado | |
dc.source | Scopus | |
dc.title | Non-uniform Composite Representation Of Hydroelectric Systems For Long-term Hydrothermal Scheduling | |
dc.type | Actas de congresos | |