dc.contributorZabala, Washington
dc.contributorSantillán, Marco
dc.contributorSinchiguano, Pablo
dc.creatorSánchez Barroso, Dario Fernando
dc.date.accessioned2016-07-28T20:51:30Z
dc.date.available2016-07-28T20:51:30Z
dc.date.created2016-07-28T20:51:30Z
dc.date.issued2016-07
dc.identifierSánchez Barroso, Dario Fernando. (2016). Análisis de confiabilidad, mantenibilidad y disponibilidad del sistema de compresión de gas, en la Central de Facilidades de Producción del Bloque 15, Petroamazonas, Cantón Shushufindi. Escuela Superior Politécnica de Chimborazo. Riobamba.
dc.identifierhttp://dspace.espoch.edu.ec/handle/123456789/5080
dc.description.abstractThe present research was led to an analysis of Reliability, Maintainability and Availability from Gas Compression System of central production facilities Block 15, Petroamazonas EP, located in Shushufindi, Sucumbíos province; it stood in phase II maturity or life within the curve Davies. The mathematical equations that govern each of its subsystem were established, which allowed them to know the current state of the system and predict their future behavior. The methodology used to obtain reliability, maintainability and availability (RAM), was proposed by the author Mora Gutierrez, where began analyzing data from up time (UT) and down time (DT). Availability (inherent) was select according to the operating context of the company. Data were obtained through documentary research and further supported by interviews with operating and maintenance personnel of the A company. Unreliability parameters for COM107A 47.84%, 2601% COM107B was estimated over a period of 1080 hours and maintainability for COM107A 66.87%, 67.03% COM107B within 24 hours. Then the values were obtained (β) for COM107A 0.98, COM107B 1.29, eta (η) COM107A 1474.02 COM107B 857.52, mean time between failures (MTBF) COM107A 1484.18 COM107B 793.02 hours and hours and mean time between repair (MTTR) were obtained COM107A 21 hours COM107B 23.5 Hours. With this it was concluded that the COM107B is the most critical subsystem and high priority system center of gas compression. Based on the results obtained were recommend the Superintendence of Maintenance Block 15 Petroamazonas EP, adjusting the frequency of preventive and predictive maintenance of COM107A and COM107B subsystems, comprising the gas compression system.
dc.languagespa
dc.publisherEscuela Superior Politécnica de Chimborazo
dc.relationUDCTIPEC;20T00748
dc.rightshttps://creativecommons.org.//licenses/by-nc-sa/3.0/ec/
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectTIEMPO NO OPERATIVO
dc.subjectPARÁMETRO DE FORMA (BETA)
dc.subjectPRODUCCIÓN PETROLERA
dc.subjectSISTEMA DE COMPRESIÓN DE GAS
dc.subjectSHUSHUFINDI (CANTÓN)
dc.subjectBLOQUE 15 PETROAMAZONAS EP
dc.subjectINGENIERÍA EN MANTENIMIENTO
dc.subjectPARÁMETRO DE ESCALA (ETA)
dc.titleAnálisis de confiabilidad, mantenibilidad y disponibilidad del sistema de compresión de gas, en la Central de Facilidades de Producción del Bloque 15, Petroamazonas, Cantón Shushufindi
dc.typeTesis


Este ítem pertenece a la siguiente institución