dc.contributorSantillán Mariño, Carlos
dc.contributorFreire Miranda, Jorge
dc.contributorAstudillo Machuca, César
dc.creatorArregui Toro, César Daniel
dc.date.accessioned2016-07-22T15:50:11Z
dc.date.available2016-07-22T15:50:11Z
dc.date.created2016-07-22T15:50:11Z
dc.date.issued2016-07
dc.identifierArregui Toro, César Daniel. (2016). Propuesta de un plan de mantenimiento empleando la ingeniería de la fiabilidad en base al análisis de la función tasa de fallos λ(t) aplicado al sistema de bombeo de reinyección de agua del Campo Auca Bloque 61 de la Empresa Petroamazonas EP. Escuela Superior Politécnica de Chimborazo. Riobamba.
dc.identifierhttp://dspace.espoch.edu.ec/handle/123456789/5061
dc.description.abstractAt present oil markets are more competitive and oil must be extracted at the lowest Price. To meet this requirement it is necessary to have a water reinjection pumping system capable to keep technical specifications for some time, this led to this research project which purpose is to establish a proposed maintenance plan using reliability engineering based on the analysis of the rate function fault λ(t) applied to the water reinjection pumping system on Auca Field, Block 61 of the Petroamazonas EP company located in the province of Orellana. Foresee and contain break downs will help us to avoid the causes and consequences in order to prevent it from happening. The methodology used was a field research and literature documentary, a historical record of unit failures was compiled, these data and software support Fiasoft served to establish the statistical mathematical model and determine the reliability indices. With the results and reliability parameters obtained tasks are proposed in order to optimize the maintenance plan and prevent system reliability to be less than 45% and reduce the occurrence of faults which means costs reduce for corrective maintenance and unplanned shutdowns, ensuring this way system reliability and availability times of equipment. It is recommended to strictly comply with the frequency of each of the tasks proposed. It is recommended to strictly comply with the frequency of each of the tasks proposed in this maintenance plan.
dc.languagespa
dc.publisherEscuela Superior Politécnica de Chimborazo
dc.relationUDCTIPEC;20T00747
dc.rightshttps://creativecommons.org.//licenses/by-nc-sa/3.0/ec/
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectPLAN DE MANTENIMIENTO
dc.subjectFUNCIÓN TASA DE FALLOS
dc.subjectFIASOFT (SOFTWARE)
dc.subjectSISTEMA DE BOMBEO REINYECCIÓN DE AGUA
dc.subjectÍNDICES DE FIABILIDAD
dc.subjectREGISTRO DE FALLOS
dc.subjectMODELO MATEMÁTICO
dc.titlePropuesta de un plan de mantenimiento empleando la ingeniería de la fiabilidad en base al análisis de la función tasa de fallos λ(t) aplicado al sistema de bombeo de reinyección de agua del Campo Auca Bloque 61 de la Empresa Petroamazonas EP
dc.typeTesis


Este ítem pertenece a la siguiente institución