Buscar
Mostrando ítems 31-40 de 4278
Asesoría a la pequeña empresa : programación de producción - preparación
(Servicio Nacional de Aprendizaje (SENA)Subdirección General de Operaciones. División de Asesoría a las Empresas, 2017)
Evaluating genetic algorithms with different population structures on a lot sizing and scheduling problem
(2008-12-01)
This paper studies the use of different population structures in a Genetic Algorithm (GA) applied to lot sizing and scheduling problems. The population approaches are divided into two types: single-population and ...
Evaluating genetic algorithms with different population structures on a lot sizing and scheduling problem
(2008-12-01)
This paper studies the use of different population structures in a Genetic Algorithm (GA) applied to lot sizing and scheduling problems. The population approaches are divided into two types: single-population and ...
A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem
(2013-06-10)
In many production processes, a key material is prepared and then transformed into different final products. The lot sizing decisions concern not only the production of final products, but also that of material preparation ...
Discrete-Time MILP Formulation for the Optimal Scheduling of Maintenance Tasks on Oil and Gas Production Assets
(American Chemical Society, 2019-05)
In this work, we address the scheduling of general maintenance tasks on oil and gas wells and surface facilities, using a mixed integer linear programming (MILP) formulation. The problem involves multitask workorders with ...
MEASUREMENT OF COLOUR DEVELOPMENT IN PINUS RADIATA SAPWOOD BOARDS DURING DRYING AT VARIOUS SCHEDULE
(Universidad del Bío-Bío, 2005)
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014-04-18)
This paper considers a production lot sizing and scheduling problem with sequence-dependent setup times that are not triangular. Consider, for example, a product that contaminates some other product unless either a ...
Programación de producción
(Servicio Nacional de Aprendizaje (SENA)Subdirección Nacional de Operaciones. División de Asesoría a las Empresas, 2018)
DESIGN OF A HYPERHEURISTIC FOR PRODUCTION SCHEDULING IN JOB SHOP ENVIRONMENTS
(Universidad de Tarapacá., 2010)