Buscar
Mostrando ítems 11-20 de 4278
Binary integer programming formulations for scheduling in market-driven foundries
(Pergamon-Elsevier B.V. Ltd, 2010-10-01)
This paper describes the development and solution of binary integer formulations for production scheduling problems in market-driven foundries. This industrial sector is comprised of small and mid-sized companies with ...
A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem
(2013-06-10)
In many production processes, a key material is prepared and then transformed into different final products. The lot sizing decisions concern not only the production of final products, but also that of material preparation ...
Industry 4.0: Smart Scheduling
(Taylor & Francis Ltd, 2018-08-03)
Smart Manufacturing and Industry 4.0 production environments integrate the physical and decisional aspects of manufacturing processes into autonomous and decentralised systems. One of the main aspects in these systems is ...
Scheduling Grid Applications with Software Requirements
(IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC, 2011)
The aim of task scheduling is to minimize the makespan of applications, exploiting the best possible way to use shared resources. Applications have requirements which call for customized environments for their execution. ...
Dynamic models for production control and scheduling.
(IEEECidade do México, 2013)
Agility may be an important competitive advantage in many markets. In order to achieve it, the dynamics of the manufacturing systems must be considered. Control theory supports the development of dynamic models for production ...
Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems
(Springer, 2020-09-04)
In this paper, we address a two-stage integrated lot-sizing, scheduling and cutting stock problem with sequence-dependent setup times and setup costs. In production stage one, a cutting machine is used to cut large objects ...
Lot sizing and furnace scheduling in small foundries
(2008-03-01)
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which ...
Lot sizing and furnace scheduling in small foundries
(2008-03-01)
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which ...