Buscar
Mostrando ítems 11-20 de 136
A Tabu search Approach for the Weighted Tardiness with Sequence-Dependent Setups in one-machine ProblemA Tabu search Approach for the Weighted Tardiness with Sequence-Dependent Setups in one-machine Problem
(Universidad de Costa Rica, Centro de Investigación en Matemática Pura y Aplicada (CIMPA), 2002)
A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan
(Computers & Operations Research, 2016)
This paper considers the problem of scheduling a set of jobs subject to arbitrary release dates and sequence-dependent setup times on a single machine with the objective of minimizing the maximum completion of all the jobs, ...
A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem
(Pergamon-elsevier Science LtdOxfordInglaterra, 2014)
Maximização da produção em uma fábrica de sorvetes utilizando uma abordagem integrada de dimensionamento e sequenciamento de lotes
(Universidade Estadual Paulista (Unesp), 2018-12-06)
O presente estudo visa maximizar a produção do processo mais restritivo em uma fábrica de sorvetes, aplicando uma adaptação do modelo de otimização matemática GLSPST (General Lot sizing and Sequence dependent Setup Times). ...
A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem
(2013-06-10)
In many production processes, a key material is prepared and then transformed into different final products. The lot sizing decisions concern not only the production of final products, but also that of material preparation ...
Programação de produção levando em conta máquinas em paralelo e set-up dependente da sequência de produção
(Universidade Tecnológica Federal do ParanáCuritibaPrograma de Pós-Graduação em Engenharia Mecânica e de Materiais, 2012-07)
Due to economic growth, companies in general – but particularly manufacturing industries - end up looking for a way to eliminate losses that are evident and others that are not so easy to identify so as to maximize profits. ...
Meta-heurística para programação da produção com tempos de preparação dependentes da seqüênciaMetaheuristic for scheduling with dependent setup times
(Universidade Federal de São Carlos, 1995)