Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
(Springer, 2007-08-01)
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking ...
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
(Springer, 2007-08-01)
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking ...
A Tabu search Approach for the Weighted Tardiness with Sequence-Dependent Setups in one-machine ProblemA Tabu search Approach for the Weighted Tardiness with Sequence-Dependent Setups in one-machine Problem
(2011-04-29)
In this paper, a Tabu Search Approach for the weighted tardiness single machine problem with sequence-dependent setups is proposed. The main contribution is the balance obtained between intensification and diversification ...
A Tabu search Approach for the Weighted Tardiness with Sequence-Dependent Setups in one-machine ProblemA Tabu search Approach for the Weighted Tardiness with Sequence-Dependent Setups in one-machine Problem
(2011-04-29)
In this paper, a Tabu Search Approach for the weighted tardiness single machine problem with sequence-dependent setups is proposed. The main contribution is the balance obtained between intensification and diversification ...
A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem
(2013-06-10)
In many production processes, a key material is prepared and then transformed into different final products. The lot sizing decisions concern not only the production of final products, but also that of material preparation ...
Mathematical model and solution approaches for integrated lot-sizing, scheduling and cutting stock problems
(Springer, 2020-09-04)
In this paper, we address a two-stage integrated lot-sizing, scheduling and cutting stock problem with sequence-dependent setup times and setup costs. In production stage one, a cutting machine is used to cut large objects ...