An optimal power flow solution to deregulated electricity power market using meta-heuristic algorithms considering load congestion environment
In this article, the Improved Mayfly Algorithm (IMA) is used as an upgraded form of the Mayfly Algorithm (MA), featuring simulated binary crossover and polynomial mutation operators replacing the arithmetic crossover and ...
Electricity retail market and accountability-based strategic bidding model with short-term energy storage considering the uncertainty of consumer demand response
(Cartagena de Indias, 2022)
Electricity retailers participate in electricity markets as intermediaries between wholesale and retail markets. They acquire energy on the wholesale side by participating in next-day markets and the pool of power. On the ...
Ramping ancillary service for cost-based electricity markets with high penetration of variable renewable energy
(2020)
System operators and electricity market stakeholders are facing new challenges related to increasing variability in both generation and demand. Rising generation levels of variable renewable energy (VRE) sources cause ...
Short-term forecasting of electricity prices in the Colombian electricity market
(INST ENGINEERING TECHNOLOGY-IET, 2009)
The restructuring of the electricity-generating industry from protected monopoly to an open competitive market has presented producers with a problem scheduling generation: finding the optimal bidding strategy to maximise ...
A Randomized Controlled Trial to Assess Safety, Tolerability, and Antepartum Viral Load with Increased Lopinavir/Ritonavir Dosage in Pregnancy
(Mary Ann Liebert, Inc, 2013-11-01)
HIV mother-to-child transmission (MTCT) is significantly reduced if antepartum viral load (apVL) is<50 copies/mL. Pharmacokinetic studies suggest increasing the dosage of lopinavir/ritonavir (LPV/r) in pregnancy. It is ...
A randomized study investigating the efficacy and safety of amprenavir in combination with low-dose ritonavir in protease inhibitor-experienced HIV-infected adults
(Blackwell Publishing LtdOxfordInglaterra, 2004)
Verxve 144-week results: Nevirapine extended release (nvp xr) qd versus nvp immediate release (ir) bid with ftc/tdf in treatment-naive hiv-1 patients
(2013)
Background: We report 96- and 144-week follow-up data from VERxVE, demonstrating that nevirapine (NVP) extended release (XR) 400 mg once daily was non-inferior to NVP immediate release (IR) 200 mg twice daily, each ...
An Improved Deep Learning Model for Electricity Price Forecasting
Accurate electricity price forecasting (EPF) is important for the purpose of bidding strategies and minimizing the risk for market participants in the competitive electricity market. Besides that, EPF becomes critically ...