Search
Now showing items 1-10 of 4896
Models for capacitated lot-sizing problem with backlogging, setup carryover and crossover
(Palgrave MacmillanLondon, 2013)
Setup operations are significant in some production environments. It is mandatory that their production plans
consider some features, as setup state conservation across periods through setup carryover and crossover. ...
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014-04-18)
This paper considers a production lot sizing and scheduling problem with sequence-dependent setup times that are not triangular. Consider, for example, a product that contaminates some other product unless either a ...
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014)
Impact analysis of setup carryover and crossover on lot sizing problems
(2019-01-01)
This paper presents a literature classification and a detailed computational study analysing the impact of considering the possibility of setup carryover and crossover when solving the lot sizing problem. This problem is ...
Heuristic for flow shop sequencing with separated and sequence independent setup times
(Associação Brasileira de Engenharia e Ciências Mecânicas - ABCM, 2011)
This paper deals with the permutation flow shop scheduling problem with separated and sequence-independent machine setup times. A heuristic method with the objective of minimizing the total time to complete the schedule ...
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
(Springer, 2007-08-01)
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking ...
Split scheduling with uniform setup times
(Springer, 2015)
We study a scheduling problem in which jobs
may be split into parts, where the parts of a split job may be
processed simultaneously on more than one machine. Each
part of a job requires a setup time, however, on the ...
Production lot sizing and scheduling with non-triangular sequence-dependent setup times
(Taylor & Francis Ltd, 2014)