Long Term Transmission Expansion Planning considering Generation-Demand Scenarios and HVDC lines
(Ieee, 2016-01-01)
This paper presents a mathematical model and a methodology to solve the transmission expansion planning problem considering generation-demand scenarios and alternative investments using High Voltage Direct Current (HVDC) ...
Long term transmission expansion planning considering generation-demand scenarios and HVDC lines
(2017-01-04)
This paper presents a mathematical model and a methodology to solve the transmission expansion planning problem considering generation-demand scenarios and alternative investments using High Voltage Direct Current (HVDC) ...
Building a stochastic programming model from scratch: a harvesting management example
(Routledge, 2016)
We analyse how to deal with the uncertainty before solving a stochastic optimization problem and we apply it to a forestry management problem. In particular, we start from historical data to build a stochastic process for ...
A parallelized variable fixing process for solving multisge stochastic programs with progressive hedging
(Hindawi, 2020)
Long time horizons, typical of forest management, make planning more difficult due to added exposure to climate uncertainty. Current methods for stochastic programming limit the incorporation of climate uncertainty in ...
A strategy for transmission network expansion planning considering multiple generation scenarios
(Elsevier B.V., 2019-07-01)
Transmission network expansion planning (TNEP) is subject to several constraints that are driven by new market rules, such as generation uncertainty, demand growth, seasonal climate changes and technological advances. When ...
A strategy for transmission network expansion planning considering multiple generation scenarios
(Elsevier, 2019-07-11)
Transmission network expansion planning (TNEP) is subject to several constraints that are driven by new market rules, such as generation uncertainty, demand growth, seasonal climate changes and technological advances. When ...
A strategy for transmission network expansion planning considering multiple generation scenarios
(2019-07-01)
Transmission network expansion planning (TNEP) is subject to several constraints that are driven by new market rules, such as generation uncertainty, demand growth, seasonal climate changes and technological advances. When ...
Transmission network expansion planning for the Colombian electrical system: Connecting the Ituango hydroelectric power plant
(Elsevier B.V., 2014-05-01)
The hydroelectric power plant Hidroltuango represents a major expansion for the Colombian electrical system (with a total capacity of 2400 MW). This paper analyzes the possible interconnections and investments involved in ...