Buscar
Mostrando ítems 1-10 de 24
Formulações e heurísticas para o problema integrado de dimensionamento de lotes e de empacotamento de produtos
(Universidade Federal de Minas GeraisBrasilENG - DEPARTAMENTO DE ENGENHARIA PRODUÇÃOPrograma de Pós-Graduação em Engenharia de ProduçãoUFMG, 2018-12-20)
In the Integrated Uncapacitated Lot Sizing and Bin Packing problem we have to couple
lot sizing decisions of replenishment from single products suppliers with bin packing
decisions in the delivering of client orders. A ...
A three layer supply chain model with multiple suppliers, manufacturers and retailers for multiple items
(2014)
The replenishment size/production lot size problem both for perfect and imperfect quality products studied in this paper is motivated by the optimal strategy in a three layer supply chain consisting of multiple suppliers, ...
Modelo de reabastecimiento colaborativo entre una empresa y sus filiales internacionales
(Departamento de Ingeniería de la OrganizaciónUniversidad Nacional de Colombia - Sede Medellín, 2019-08-29)
Este trabajo de maestría presenta una propuesta para calcular el plan de reabastecimiento entre una empresa y sus filiales internacionales (1xm), a través de un modelo de colaboración basado en la estrategia de VMI y en ...
Vendor managed inventory system considering deteriorating items and probabilistic demand for a three-layer supply chain
(Elsevier Ltd.United Kingdom, 2023)
Procurement of transportation services in spot markets under a double-auction scheme with elastic demand
(PERGAMON-ELSEVIER SCIENCE LTD, 2007)
In the recent years, new electronic procurement technologies have been successfully implemented in freight transportation marketplaces. This new type of trading between freight transportation agents requires new analytical ...
An EPQ inventory model considering an imperfect production system with probabilistic demand and collaborative approach
(Emerald Group Publishing Ltd., 2019)
Purpose: The purpose of this paper is to propose an economic production quantity (EPQ) inventory model considering imperfect items and probabilistic demand for a two-echelon supply chain. The production process is imperfect ...
Vendor managed inventory system considering deteriorating items and probabilistic demand for a three-layer supply chain
(Cartagena de IndiasCampus Tecnológico, 2023-01-23)
This paper proposes a Vendor Managed Inventory model for a three-layer supply chain comprised of multiple suppliers, manufacturers, and retailers. During the production and storage of products, rates of defective and ...