Buscar
Mostrando ítems 1-10 de 254
Tabu search to solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem
(2011-08-24)
This paper proposes a tabu search approach to solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem (SITLSP). It is a real-world problem, often found in soft drink companies, where the production ...
Tabu search to solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem
(2011-08-24)
This paper proposes a tabu search approach to solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem (SITLSP). It is a real-world problem, often found in soft drink companies, where the production ...
Solving scheduling problems in a multi-stage multi-product batch pharmaceutical industry
(AIDIC Servizi, 2010-09)
An iterative two-stage decomposition solution strategy for solving real-world scheduling problems in multi-stage multi-product batch plants is presented. The proposed method has as a core a mixed integer mathematical model, ...
Solving a Large Real-world Bus Driver Scheduling Problem with a Multi-assignment based Heuristic Algorithm
(Graz Univ Technolgoy, Inst Information Systems Computer Media-iicm, 2017-01-01)
The bus driver scheduling problem (BDSP) under study consists in finding a set of duties that covers the bus schedule from a Brazilian public transportation bus company with the objective of minimizing the total cost. A ...
Solving a large real-world bus driver scheduling problem with a multi-assignment based heuristic algorithm
(2017-01-01)
The bus driver scheduling problem (BDSP) under study consists in finding a set of duties that covers the bus schedule from a Brazilian public transportation bus company with the objective of minimizing the total cost. A ...
Construction of an Optimal Solution for a Real-World Routing-Scheduling-Loading Problem
(Revista Computación y Sistemas; Vol. 13 No.4, 2010-04-14)
Abstract. This work presents an exact method for the Routing-Loading-Scheduling Problem (RoSLoP). The objective of RoSLoP consists of optimizing the delivery process of bottled products in a company study case. RoSLoP, ...
Tabu Search to Solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem
(Assoc Computing Machinery, 2011-01-01)
This paper proposes a tabu search approach to solve the Synchronized and Integrated Two-Level Lot Sizing and Scheduling Problem (SITLSP). It is a real-world problem, often found in soft drink companies, where the production ...
Knowledge representation in Industry 4.0 Scheduling problems
(Taylor & Francis Ltd, 2022-01-10)
Industry 4.0 raises the need for a closer integration of management systems in manufacturing companies. Such process is driven by Cyber-Physical Systems (CPS) and the Internet of Things (IoT). Starting from the potential ...
(Data-driven) knowledge representation in Industry 4.0 scheduling problems
(Taylor & Francis Ltd, 2022-01-10)
Industry 4.0 raises the need for a closer integration of management systems in manufacturing companies. Such process is driven by Cyber-Physical Systems (CPS) and the Internet of Things (IoT). Starting from the potential ...