Buscar
Mostrando ítems 1-10 de 33
Análise de pontos iniciais em métodos de pontos interiores para o problema de pré-despacho
(Universidade Federal de São CarlosUFSCarCâmpus SorocabaMatemática - ML-So, 2022-09-23)
Due to the complexity of the Brazilian electrical system, it is necessary to apply methods
that minimize losses in all generation and transmission stages, including the predispatch
of the system. The resolution of these ...
Primal-Dual Interior Point Method Applied to the Short Term Hydroelectric Scheduling Including a Perturbing Parameter
(Ieee-inst Electrical Electronics Engineers IncPiscatawayEUA, 2009)
MVAR management on the pre-dispatch problem for improving voltage stability margin
(Iee-inst Elec EngHertfordInglaterra, 2004)
An active/reactive predispatch model incorporating ramp rate constraints solved by dual decomposition/lagrangian relaxation
(2004-12-01)
The Predispatch model (PD) calculates a short-term generation policy for power systems. In this work a PD model is proposed that improves two modeling aspects generally neglected in the literature: voltage/reactive power ...
An active/reactive predispatch model incorporating ramp rate constraints solved by dual decomposition/lagrangian relaxation
(2004-12-01)
The Predispatch model (PD) calculates a short-term generation policy for power systems. In this work a PD model is proposed that improves two modeling aspects generally neglected in the literature: voltage/reactive power ...