Buscar
Mostrando ítems 1-10 de 416
Continuation fast decoupled power flow with secant predictor
(Institute of Electrical and Electronics Engineers (IEEE), 2003-08-01)
The conventional Newton and fast decoupled power flow methods are considered inadequate for obtaining the maximum loading point of power systems due to ill-conditioning problems at and near this critical point. At this ...
Continuation fast decoupled power flow with secant predictor
(Institute of Electrical and Electronics Engineers (IEEE), 2003-08-01)
The conventional Newton and fast decoupled power flow methods are considered inadequate for obtaining the maximum loading point of power systems due to ill-conditioning problems at and near this critical point. At this ...
Three-phase fast decoupled power flow
(1999-01-01)
This paper presents power flow methods for the solution of unbalanced and balanced three-phase distribution systems. The best existing methods for solving three-phase power flow are tested and the results discussed. The ...
Continuation fast decoupled power flow with secant predictor
(Institute of Electrical and Electronics Engineers (IEEE), 2014)
Tri-state single-phase integrated inverters with input to output power decoupling control
(2012-10-05)
Researches on control for power electronics have looked for original solutions in order to advance renewable resources feasibility, specially the photovoltaic (PV). In this context, for PV renewable energy source the usage ...
Tri-state single-phase integrated inverters with input to output power decoupling control
(2012-10-05)
Researches on control for power electronics have looked for original solutions in order to advance renewable resources feasibility, specially the photovoltaic (PV). In this context, for PV renewable energy source the usage ...
Parameterized fast decoupled power flow methods for obtaining the maximum loading point of power systems. Part II. Performance evaluation
(Elsevier B.V., 2004-04-01)
The parameterized fast decoupled power flow (PFDPF), versions XB and BX, using either theta or V as a parameter have been proposed by the authors in Part I of this paper. The use of reactive power injection of a selected ...
Parameterized fast decoupled power flow methods for obtaining the maximum loading point of power systems. Part II. Performance evaluation
(Elsevier B.V., 2004-04-01)
The parameterized fast decoupled power flow (PFDPF), versions XB and BX, using either theta or V as a parameter have been proposed by the authors in Part I of this paper. The use of reactive power injection of a selected ...
Obtaining the Maximum Loading Point of Electric Power Systems using the Decoupled Methods of Newton
(Ieee-inst Electrical Electronics Engineers Inc, 2016-01-01)
This paper presents a proposed Newton decoupled method modification (simultaneous resolution algorithm and alternate) with the addition of an equation line passing through of a point in the plane determined by the variables: ...