Buscar
Mostrando ítems 1-10 de 85
Solving scheduling problems in a multi-stage multi-product batch pharmaceutical industry
(AIDIC Servizi, 2010-09)
An iterative two-stage decomposition solution strategy for solving real-world scheduling problems in multi-stage multi-product batch plants is presented. The proposed method has as a core a mixed integer mathematical model, ...
Optimization of a biotechnological multiproduct batch plant design for the manufacture of four different products: a real case scenario
(John Wiley, 2017)
In this work a biotechnological multiproduct batch plant
that manufactures four different recombinant proteins for human
application is described in some detail. This batch plant design is then
optimized with regards ...
Short-term planning and scheduling in multipurpose batch chemical plants: a multi-level approach
(Pergamon-elsevier Science LtdOxfordInglaterra, 2000)
Development of multi-modal control programs for continuous-discrete process supervision
(Elsevier, 2009)
Continuos-discrete processes are characterized by the strong coupling of continuos state dynamics of recipe-driven discontinuos operations and the discrete state dynamics of logic-based controllers acting at the interface ...
Comparing the performances of two techniques for the optimization under parametric uncertainty of the simultanenous design and planning of a multiproduct batch plant
(Universidade Federal de Santa Catarina, 2013-10)
This paper addresses the comparison between two techniques for the optimization under parametric uncertainty of multiproduct batch plants integrating design and production planning decisions. This problem has been conceived ...
IJIE-2013: Comparing the Performances of Two Techniques for the Optimization under Uncertainty of the Simultaneous Design and Planning of a Multiproduct Btach Plant
(Universidad Federal de Santa Catarina, 2013-06)
This paper addresses the comparison between two techniques for the optimization under parametric uncertainty of multiproduct batch plants integrating design and production planning decisions. This problem has been conceived ...