Buscar
Mostrando ítems 1-10 de 48
Localização de centros de auxílio e distribuição de suprimentos em operações de respostas a desastres
(Universidade Federal de São CarlosUFSCarPrograma de Pós-Graduação em Engenharia de Produção - PPGEP-SoCâmpus Sorocaba, 2015-09-15)
The recent natural disasters around the world have shown the difficulties of the various organi- zations in effectively manage post-disaster operations. These difficulties reflect the complexity of ...
Reformulation and a Lagrangian heuristic for lot sizing problem on parallel machines
(Springer, 2014-06-01)
We consider the capacitated lot sizing problem with multiple items, setup time and unrelated parallel machines. The aim of the article is to develop a Lagrangian heuristic to obtain good solutions to this problem and good ...
Lot sizing and furnace scheduling in small foundries
(2008-03-01)
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which ...
Lot sizing and furnace scheduling in small foundries
(2008-03-01)
A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which ...
Integrated pulp and paper mill planning and scheduling
(Elsevier Ltd.Amsterdam, 2012)
This article describes a real-world production planning and scheduling problem occurring at an integrated pulp and paper mill (P&P) which manufactures paper for cardboard out of produced pulp. During the cooking of wood ...
Single-commodity robust network design problem: Complexity, instances and heuristic solutions
(ELSEVIER SCIENCE BV, 2014)