A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem
(2013-06-10)
In many production processes, a key material is prepared and then transformed into different final products. The lot sizing decisions concern not only the production of final products, but also that of material preparation ...
Integrated lot-sizing and cutting stock problem applied to the mattress industry
(2020-01-01)
In many productive processes, two important problems arise in the production planning: the lot-sizing problem and the cutting stock problem. Generally, companies deal with these problems separately but, by considering them ...
Liability of middleness revisited: The advantages for mid-sized competitors in renewable natural resource industries
(Cambridge University Press, 2019-12)
Size is an important antecedent of firm survival, and several studies theoretically sustain and empirically support a 'liability of middleness'. Indeed, it is widely believed that companies should act strategically to ...
Optimization Of An Integrated Lot Sizing And Cutting Stock Problem In The Paper Industry
(Sociedade Brasileira de Matemática Aplicada e Computacional, 2016)
When Being Large Is Not an Advantage: How Innovation Impacts the Sustainability of Firm Performance in Natural Resource Industries
(2022)
This paper provides an in-depth study of how incremental innovation, a ubiquitous factor, affects the sustainability of performance of small- and large-sized firms differently. Specifically, this work examines the ...
Heuristics and meta-heuristics for lot sizing and scheduling in the soft drinks industry: A comparison study
(2008-09-04)
This chapter studies a two-level production planning problem where, on each level, a lot sizing and scheduling problem with parallel machines, capacity constraints and sequence-dependent setup costs and times must be solved. ...
Heuristics and meta-heuristics for lot sizing and scheduling in the soft drinks industry: A comparison study
(2008-09-04)
This chapter studies a two-level production planning problem where, on each level, a lot sizing and scheduling problem with parallel machines, capacity constraints and sequence-dependent setup costs and times must be solved. ...
Increased Inventory Turnover through a Lean Warehousing Management Model in SMEs Suppliers to the Food Industry
(IEEEUS, 2022)
This research article is developed in an importing and marketing company belonging to the food industry in Peru. It is known that warehousing is one of the main costs incurred by a company in this industry; therefore, in ...