Buscar
Mostrando ítems 1-10 de 302
Short-term hydrothermal generation scheduling model using a genetic algorithm
(IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC, 2003)
A new model to deal with the short-term generation scheduling problem for hydrothermal systems is proposed. Using genetic algorithms (GAs), the model handles simultaneously the subproblems of short-term hydrothermal ...
A nonlinear model for the long-term hydro-thermal generation scheduling problem over multiple areas with transmission constraints
(2009-09-22)
This paper presents a nonlinear model with individual representation of plants for the centralized long-term hydrothermal scheduling problem over multiple areas. In addition to common aspects of long-term scheduling, this ...
A nonlinear model for the long-term hydro-thermal generation scheduling problem over multiple areas with transmission constraints
(2009-09-22)
This paper presents a nonlinear model with individual representation of plants for the centralized long-term hydrothermal scheduling problem over multiple areas. In addition to common aspects of long-term scheduling, this ...
A nonlinear model for the long-term hydro-thermal generation scheduling problem over multiple areas with transmission constraints
(Ieee, 2009-01-01)
This paper presents a nonlinear model with individual representation of plants for the centralized long-term hydrothermal scheduling problem over multiple areas. In addition to common aspects of long-term scheduling, this ...
Hydrothermal market simulator using game theory: assessment of market power
(IEEE, 2003)
The aim of this work is to build a model able to simulate a hydrothermal electric power market based on simple bids to a power exchange. The model studies the behavior of different market agents in a short-term horizon and ...
Network-Constrained Multiperiod Auction for Pool-Based Electricity Markets of Hydrothermal Systems
(Ieee-inst Electrical Electronics Engineers Inc, 2017-11-01)
Network-constrained market clearing procedures in pool-based electricity markets of hydropower systems have traditionally neglected the constraints associated with physical and operating aspects of hydroelectric generation ...