Buscar
Mostrando ítems 1-10 de 36738
The Construction Site Management of Concrete Prefabricated Buildings by ISM-ANP Network Structure Model and BIM under Big Data Text Mining Analytic Network Process (ANP)
In the construction industry, prefabricated buildings have developed rapidly in recent years due to their various excellent properties. To expand the application of big data text mining and Building Information Model (BIM) ...
Performance Evaluation of First-Order Hydraulic Models for COD Removal in Horizontal Subsurface-Flow Constructed Wetlands
(Asce-amer Soc Civil Engineers, 2017-10-01)
The aims of the present study are to verify the performance of four first-order hydraulic models and identify the model that best described the kinetics of the chemical oxygen demand (COD) removal in constructed wetlands. ...
Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models
(ELSEVIER SCIENCE BV, 2008)
This paper presents time-space analyses of construction operations supported by quantitative information extracted from 4D CAD models. The application of 4D models is a promising approach to help introduce construction ...
Method to produce field instructions from product and process models for cast-in-place concrete operations
(ELSEVIER SCIENCE BV, 2012)
The state-of-practice method to produce good and formal work instructions for construction laborers takes time, is error prone and produces outcomes with inconsistent format and content. That is why contractors rely on ...
Sustainability in the Civil Construction Sector Supported by Industry 4.0 Technologies: Challenges and Opportunities
(2022-02-01)
The civil construction sector is under pressure to make construction processes more sustainable, that is, aligned with economic, social, and environmental sustainability. Thus, the research question considers: How do ...
Design, construction and validation of a rubric to evaluate mathematical modelling in school education
(2022)
This study describes the design, construction and validation of a rubric for assessing mathematical modelling processes throughout schooling (3–18 years), especially those oriented by modelling cycles. The final version ...