Buscar
Mostrando ítems 61-70 de 14524
SDDP for some interstage dependent risk-averse problems and application to hydro-thermal planning
(Springer, 2014-01)
We consider interstage dependent stochastic linear programs where both the random right-hand side and the model of the underlying stochastic process have a special structure. Namely, for equality constraints (resp. inequality ...
A comparison of mixed-integer linear programming models for workforce scheduling with position-dependent processing times
(Journal Engineering Optimization, 2018)
Only a few studies in the available scientific literature address the problem of having a group of workers that do not share identical levels of productivity during the planning horizon. This study considers a workforce ...
Process performance models in the optimization of multiproduct protein production plants
(John Wiley & Sons Inc, 2001-07-27)
In this work we propose a model that simultaneously optimizes the process variables and the structure of a multiproduct batch plant for the production of recombinant proteins. The complete model includes process performance ...
Argumentation Based on Logic Programming
(College Publications, 2018)
Among of the programming paradigms based on formal logic, Logic Programming has been a successful effort to create a declarative model of expressing computational processes producing significant theoretical and practical ...
Simulation environment of distance protection with ATP and foreign models
(2011-12-12)
This paper presents an interactive simulation environment for distance protection, developed with ATP and foreign models based on ANSI C. Files in COMTRADE format are possible to generate after ATP simulation. These files ...
Simulation environment of distance protection with ATP and foreign models
(2011-12-12)
This paper presents an interactive simulation environment for distance protection, developed with ATP and foreign models based on ANSI C. Files in COMTRADE format are possible to generate after ATP simulation. These files ...
Mathematical model based on linear programming and fuzzy logic for time prediction in bicycle assembly industries
(2019)
© 2019, Associacao Iberica de Sistemas e Tecnologias de Informacao. All rights reserved. In the assembly industry, there is a high degree of uncertainty when identifying operational problems, due to limited resources and ...