Buscar
Mostrando ítems 31-40 de 18502
Método de integración por partes
(2019-04-01)
El método de integración por partes reduce el
cálculo de una integral formada por un
producto al cálculo de otra para la cual se
puede encontrar más fácilmente la solución
mediante la aplicación la fórmula
The integrated lot sizing and cutting stock problem with saw cycle constraints applied to furniture production
(2017-03-01)
The integrated lot sizing and cutting stock problem is studied in the context of furniture production. The goal is to capture the interdependencies between the determination of the lot size and of the cutting process in ...
Reduced order modeling strategies for computational multiscale fracture
(Elsevier Science, 2016-10)
The paper proposes some new computational strategies for affordably solving multiscale fracture problems through a FE2 approach. To take into account the mechanical effects induced by fracture at the microstructure level ...
Resource Management Model to Reduce Maintenance Service Times for SMEs in Lima-Peru
(Springer Science and Business Media Deutschland GmbH, 2022-01-01)
Currently, companies engaged in maintenance and repair work are being affected due to the gradual increase in delays in their services. Consequently, an important economic impact has been generated in the sector, which is ...
Análise da divergência na integral de transferência do modelo Peyrard-Bishop de DNA
(Universidade Federal de Minas GeraisUFMG, 2016-03-17)
The Peyrard-Bishop model is a classical approach to describe the molecular interaction in DNA and RNA, where the double strand is considered as perfectly flat, without the characteristic helical torsion. The model Hamiltonian ...
The integrated lot sizing and cutting stock problem in a furniture factory
(2013-08-08)
This work studies the integrated lot sizing and cutting stock problem, where the goal is to capture the dependency that exists between two important decisions in the production process, in order to economize raw materials ...
The integrated lot sizing and cutting stock problem in a furniture factory
(2013-08-08)
This work studies the integrated lot sizing and cutting stock problem, where the goal is to capture the dependency that exists between two important decisions in the production process, in order to economize raw materials ...