Buscar
Mostrando ítems 21-30 de 233
Dynamic Optimization in Process systems
(CRC Press - Taylor & Francis Group, 2014)
This chapter provides a general description of dynamic optimization problems and available numerical methods. These methods can be broadly classified as indirect or variational approaches and direct approaches, which can ...
Tools for improving feeding strategies in a SBR with several species
(2014)
This paper analyzes feeding strategies in a sequential batch reactor (SBR) with the objective of reaching a given (low) substrate level as quickly as possible for a given volume of water. Inside the SBR, several species ...
An inexact restoration strategy for the globalization of the sSQP method
(Springer, 2013-04)
A globally convergent algorithm based on the stabilized sequential quadratic programming (sSQP) method is presented in order to solve optimization problems with equality constraints and bounds. This formulation has ...
Expropriation : A Mechanism Design Approach.
(2020)
This paper studies the problem of an agent that needs to buy a fixed amount of units from multiple firms with private information regarding their costs of production. We characterize the optimal —cost minimizing— mechanism ...
Dynamic Optimization in Process Systems
(CRC Press - Taylor & Francis Group, 2020)
Dynamic models describe many operations and processes that take place in several disciplines, including chemical engineering, economics, ecological engineering, management of communications services and aeronautics, among ...
Acceleration of the Geostatistical Software Library (GSLIB) by code optimization and hybrid parallel programming
(Elsevier, 2015)
The Geostatistical Software Library (GSLIB) has been used in the geostatistical community for more than thirty years. It was designed as a bundle of sequential Fortran codes, and today it is still in use by many practitioners ...
Optimization of construction projects budget minimizing risks using the Monte Carlo method
(Institute of Electrical and Electronics Engineers Inc., 2020-09-30)
Currently, it is common for the risks in construction projects to generate significant budgetary deviations due to their null or insufficient identification and quantification. In relation to this point, and with the focus ...