Buscar
Mostrando ítems 21-30 de 314
A Mixed-Integer Linear Programming Model for the Electric Vehicle Charging Coordination Problem in Unbalanced Electrical Distribution Systems
(2015-09-01)
This paper presents a novel mixed-integer linear programming (MILP) model for the electric vehicle charging coordination (EVCC) problem in unbalanced electrical distribution systems (EDSs). Linearization techniques are ...
A Cluster-based Optimization Approach for the Multi-depot Heterogeneous Fleet Vehicle Routing Problem with Time Windows
(Elsevier Science, 2007-12)
This paper presents a novel three-phase heuristic/algorithmic approach for the multi-depot routing problem with time windows and heterogeneous vehicles. It has been derived from embedding a heuristic-based clustering ...
Domain reduction using GRASP construction phase for transmission expansion planning problem
(2012-04-03)
This paper proposes a new strategy to reduce the combinatorial search space of a mixed integer linear programming (MILP) problem. The construction phase of greedy randomized adaptive search procedure (GRASP-CP) is employed ...
Domain reduction using GRASP construction phase for transmission expansion planning problem
(2012-04-03)
This paper proposes a new strategy to reduce the combinatorial search space of a mixed integer linear programming (MILP) problem. The construction phase of greedy randomized adaptive search procedure (GRASP-CP) is employed ...
Optimization model for the detailed scheduling of multi-source pipelines
(Elsevier, 2015-08)
Pipeline networks are the shippers? first choice for carrying large volumes of refined petroleum products from oil refineries to distant distribution terminals. Optimization approaches for solving the pipeline scheduling ...
Optimización multiperíodo de una cadena de suministro hospitalaria
(Universidad Tecnológica Nacional, 2017-03)
Este trabajo presenta un modelo de optimización multiperíodo para el planeamiento de las actividades logísticas de una cadena de suministro hospitalaria. El propósito es generar una agenda de tareas de reposición dentro ...
A general resource-constrained scheduling framework for multistage batch facilities with sequence-dependent changeovers
(Pergamon-Elsevier Science Ltd, 2009-04)
This work introduces a new MILP sequential approach to the short-term scheduling of multistage batch plants that accounts for sequence-dependent changeover times, intermediate due dates and limited availability of renewable ...