Buscar
Mostrando ítems 1-10 de 29700
A new Requirements Engineering approach for Manufacturing based on Petri Nets
(2019-11-02)
Manufacturing systems are going through strategic changes to move from current massive customization production process towards new digital models - also called Industry 4.0. Process planning for this new approaches demand ...
A new Requirements Engineering approach for Manufacturing based on Petri Nets
(2019-11-02)
Manufacturing systems are going through strategic changes to move from current massive customization production process towards new digital models - also called Industry 4.0. Process planning for this new approaches demand ...
Woody plant encroachment constrains regeneration of ground-layer species in a neotropical savanna from seeds
(2022-01-01)
Woody plants have been encroaching into savannas on a global scale. Global climatic changes, along with changes to disturbance regimes, are considered to be the main drivers of this process. Particularly, many formerly ...
Organizational adaptation to climate change: learning to anticipate energy disruptions
(Emerald Group Publishing Ltd, 2017)
Purpose - This paper aims to investigate how organizational learning (OL) affects the development of anticipatory adaptation to climate change in companies. Because the need to learn increases in circumstances of greater ...
Size matters: Changing population structure means changing sampling requirements for schistosome populations
(Sociedade Brasileira de Medicina Tropical, 2016)
Project Scope Management: A Strategy Oriented to the Requirements Engineering
(Scitepress, 2017-01-01)
Scope management is an area of project management defined by PMBoK, which has processes to register and control everything that belongs to the project boundaries. Although the relevance of this area to the success of ...
Project scope management: A strategy oriented to the requirements engineering
(2017-01-01)
Scope management is an area of project management defined by PMBoK, which has processes to register and control everything that belongs to the project boundaries. Although the relevance of this area to the success of ...