Open pit mine planning considering geomechanical fundamentals
(Taylor & Francis LTD, 2018)
The objective of this study is to integrate the admissible factor of safety (FoS) into the mine planning. The analysis showed, as expected, that a lower net present value (NPV) is obtained with the increase in the admissible ...
Transforming open mining pits into fish farms: Moving towards sustainability
(2004-08-01)
The legacy of mining activities has typically been land 'returned to wildlife', or, at some sites, degraded to such an extent that it is unsuitable for any alternate use. Progress towards sustainability is made when value ...
Transforming open mining pits into fish farms: Moving towards sustainability
(2004-08-01)
The legacy of mining activities has typically been land 'returned to wildlife', or, at some sites, degraded to such an extent that it is unsuitable for any alternate use. Progress towards sustainability is made when value ...
Optimum ramp design in open pit mines
(Elsevier, 2020)
The problem studied in this paper is that of designing the optimal open pit haulage ramp that, for a given ramp width and a maximum ramp gradient, connects two points of the mine, minimising construction and operational ...
A new model for automated pushback selection
(Pergamon-Elsevier, 2020)
The design of pushbacks is essential to long-term open pit mine scheduling because it partitions the pit space into individual units, controlling ore and waste production. In this paper, a new model is proposed for the ...
Increasing the value and feasibility of open pit plans by integrating the mining system into the planning process
(The Southern African Institute of Mining and Metallurgy, 2016)
We present a model that allows us to consider mine production scheduling coupled with the mining system at different levels of detail: from the standard origin-destination approach to a network considering different ...
Optimal Economic Envelope of Joint Open-Pit and Underground Mines
()
The costs and complexity of the mine operation increase as extraction in an open pit mine
progresses, making the use of underground methods more and more appealing. A natural
question is, therefore, what are the boundaries ...
Development of a predictive model of fragmentation using drilling and blasting data in open pit mining
(Southern African institute mining metallurgy, 2017)
This article presents predictive statistical models for fragmentation in open pit mines using drill-and-blast data. The main contribution of this work is the proposing of statistical models to determine the correlations ...
Optimal Economic Envelope of Joint Open-Pit and Underground Mines
(2015)
The costs and complexity of the mine operation increase as extraction in an open pit mine progresses, making the use of underground methods more and more appealing. A natural question is, therefore, what are the boundaries ...