Actas de congresos
Methodology For Dimensioning Of The Resources For Construction Of The Oil Wells
Registro en:
9781618390189
Society Of Petroleum Engineers - Brazil Offshore Conference 2011. , v. 1, n. , p. 52 - 67, 2011.
2-s2.0-80052605901
Autor
Filardo J.
Morooka C.
Institución
Resumen
This paper proposes a new methodology for determining the quantity of physical resources used for the construction of oil wells in relation to the methodology that employs a rough assessment of the curve of resource needs in the time it does not take into account the risks and gains for the business. With emphasis on material resources, and using knowledge of geo-engineering, petroleum engineering, production engineering, economic engineering, project management, artificial intelligence and programming, an equation was established with terms representing the potential revenue from the wells and the costs of excess or the lack of resources in the planning period which enables the knowledge of the optimum quantitative of resources for the company. The design method has been tested to determine the quantity of pipe casing used in Brazilian exploration wells planned for 2009, based on the configuration of the pre-salt wells. It is concluded that this methodology has significant gains over the conventional method of analysis by allowing the decision makers to know how much will be your revenue and associated costs, risks and opportunities. Copyright 2011, Society of Petroleum Engineers. 1
52 67 Weatherford,BG Brasil,RCL Jacinto, C.M.C., Optimizing the route of the rigs in the development of a field: The case of East Albacora (2001) IV Well Engineering Workshop. Petrobras, Rio de Janeiro, p. 5. , November Araújo, R.M., (2002) Simulation Model for Evaluating Stream Road Transport of Land Drilling Rigs for Oil Wells,(Modelo de Simulação para Avaliação Do Fluxo de Transporte Rodoviário de Sondas de Perfuração Terrestre de Poços de Petróleo), p. 126. , Dissertation (Masters in Industrial Engineering), University of Santa Catalina, Florianópolis, Brazil Viana, H.L., (2003) Method for Estimation of the Optimal Quantity of Production Rigs in Oil Field: Case Study (Método para Dimensionamento Da Quantidade Ótima de Sondas de Produção Em Um Campo de Petróleo: Estudo de Caso), p. 157. , 2003. Dissertation (Masters in Industrial Engineering), University of Santa Catarina, Florianópolis, Brazil Aloise, D.J., Scheduling Workover Rigs for Onshore Oil Production (2005) Discrete Applied Mathmatics, 154, pp. 695-702. , www.elsevier.com/locate/dam, November. Available in Irgens, M., Lavenue, W.L., Use of Advanced Optimization Techiques to Manage a Complex Drilling Schedule (2007) SPE Annual Technical Conference and Exhibition. California, p. 9. , Paper SPE 110805. Presented at the November Bourgoyne Jr., A.T., (1991) Applied Drilling Engineering, p. 502. , 2. ed. Texas: SPE Perrin, D., (1999) Well Completion and Services: Oil and Gas Field Development Techniques, p. 325. , Paris: Editions Technip: Institut Français Du Pétrole Publications Miura, K., (2004) A Study on Operational Safety in Construction and Repair of Maritime Oil Wells (Um Estudo Sobre a Segurança Operacional Na Construção e Reparo de Poços Marítimos de Petróleo), p. 242. , 2004. Thesis (Ph.D. in Science and Petroleum Engineering) - Department of Petroleum Engineering, Faculty of Mechanical Engineering, University of Campinas, Campinas, Brazil Newendorp, P.D., (1975) Decision Analysis for Petroleum Exploration, p. 663. , Oklahoma: The Petroleum Publishing Company Vose, D., (1996) Quantitative Risk Analysis: A Guide to Monte Carlo Simulation Modelling, p. 328. , Chichester: John Willey & Sons Ltda Megill, R.E., (1979) An Introduction to Risk Analysis, p. 274. , 2. ed. Oklahoma: PennWell Publishing Company Prasad, S., Classification of Inventory Models and System (1993) International Journal of Production Economics, 34, pp. 209-222. , www.elsevier.com, November. Available in Mohaghegh, S., (2000) Virtual-Intelligence Applications in Petroleum Engineering: Part-2-Evolutionary Computing, , SPE, West Virginia University Beltrão, R.L.C., (2009) Chalenges and New Technology for de Development of the Pre-salt Chluster, Santos Bacin, Brasil, p. 11. , Paper OTC 19880 presented at OTC. Houston (2006) The Future of Geothermal Energy: Impact of Enhanced Geothermal System (EGS) on the United States in 21st Century, p. 372. , http://geothermal.inel.gov, Massachusetts Institute of Technology. Idaho Falls, available in and http://www1.eere.energy.gov/geothermal/egs-technology.html. Accessed at March (2010) Producer Price Index Detail Report: Data for April 2010, 14 (4), p. 167. , http://www.bls.gov/, United States Of America. Department of Labor. United States of America. April. Available in (2010) Fleet Status Reporter, , http://www.deepwater.com/fw/main/Home-1.html, Transocean Ltda. New York. April, 13. Available in (2010) Report: OSV Values, Trends & Market Indicator: A Broker's Perspective of the Golf of Mexico. (Contains Information on Rates of PSV Vessels), , http://www.marcon.com, Available in Acessed at April Filardo, J.G., Morooka, C.K., Metodology for Dimensioning of the Resources to Build Oil Wells (2010) V Planning, Control and Evaluation of the E&P Performance Workshop. Petrobras, Rio de Janeiro, Brazil, p. 16. , Paper presented at: September