Diseño del sistema eléctrico en baja tensión para estaciones de carga de autobuses eléctricos
Fecha
2019-04-22Autor
Alvear Muevecela, Wilder Lenin
Institución
Resumen
In the present project makes the design of low voltage electrical infrastructure of a loading station for an average fleet of 68 electric buses of the CONCUENCA consortium in city of Cuenca. The load infrastructure for the selected fleet consists 6 independent load centers, with the same characteristics, located in different sectors of city, each with a nominal power of 500 kVA and 6 charging stations or loaders. The load centers feeds from the medium voltage distribution network of the Centrosur Company, each of which has a medium voltage sectionalization center, a transformation center and a low voltage installation. The low voltage network feeds the chargers, which are responsible for satisfying energy demand of electric buses in the hours of the lowest, medium and highest consumption.