A First approach on the new transmission system in northern Brazil
(2011-12-01)
This article shows an analysis of the electrical parameters of a three-phase transmission line section using a relatively new design for steel towers characterized by 280 meters high. These main features, the height of the ...
Introduction of a Non-Conventional Solution for Amazon Transmission System: Analysis of the Electric Aspects
(Ieee, 2011-01-01)
This article shows an analysis of the longitudinal electric parameters of a three-phase transmission line/section using a 280-meter high steel tower. This characteristic, the height of the line conductors and distance ...
Introduction of a non-conventional solution for Amazon transmission system: Analysis of the electric aspects
(2011-12-09)
This article shows an analysis of the longitudinal electric parameters of a three-phase transmission line/section using a 280-meter high steel tower. This characteristic, the height of the line conductors and distance ...
Heliostat tailored to Brazil
(2015-01-01)
For Brazil, it is important to realize a high national production share because of high import fees and to obtain cost reduction related to implementation of the CSP technology. The rim drive concept offers an alternative ...
Preservação do Santuário do Sagrado Coração de Jesus: projeto pêndulo direto
(Universidade Estadual Paulista (Unesp), 2015-09-14)
The project "preservation of the Sanctuary" aims to monitor the movement, if it exist, of the tower of the Shrine of the Sacred Heart of Jesus in Vera Cruz (SP). This project started because of the appearance of cracks ...
Leagile - The New Framework For The Supply Chain Management
(Institute of Industrial Engineers, 2011)