Buscar
Mostrando ítems 31-40 de 7569
Primary power distribution systems planning taking into account reliability, operation and expansion costs
(Inst Engineering Technology-iet, 2012-03-01)
In this work, the planning problem of primary distribution networks is formulated as a multi-objective mixed-integer non-linear programming model (MINLP). The objective functions of this model are the expansion and operation ...
Multistage reliability-based expansion planning of AC distribution networks using a mixed-integer linear programming model
(2022-06-01)
A new mathematical model for the multistage distribution network expansion planning problem considering reliability is proposed in this paper. Decisions related to substation and branch expansion are driven by the minimization ...
Site Management of Work-in-Process Buffers to Enhance Project Performance Using the Reliable Commitment Model: Case Study
(ASCE-AMER SOC CIVIL ENGINEERS, 2011)
Buffers have been commonly used as a production strategy to protect construction processes from the negative impact of variability. Construction practitioners and researchers have proposed several buffering approaches for ...
Confiabilidade humana: gerenciamento de alarmes na prevenção de acidentes de processo
(Universidade do Vale do Rio dos Sinos, 2015)
This article discusses the practice of alarm management, its positive effects on process safety incidents prevention, as well as the decisive role of the console operator and its importance to business continuity, adding ...
Confiabilidade humana: gerenciamento de alarmes na prevenção de acidentes de processo
(Universidade do Vale do Rio dos Sinos, 2015)
This article discusses the practice of alarm management, its positive effects on process safety incidents prevention, as well as the decisive role of the console operator and its importance to business continuity, adding ...
Estudo de um programa de MCC em máquina de refrigeração CHILLER
(Universidade Tecnológica Federal do ParanáCuritibaDepartamento Acadêmico de Eletrotécnica, 2012-10-19)
This project presents the process of implementation of Reliability Centered Maintenance (RCM) in refrigeration equipment called chiller. This equipment is responsible for refrigeration and water circulation in several ...
Switch allocation problems in power distribution systems
(Ieee-inst Electrical Electronics Engineers Inc, 2015)
Switch allocation problems in power distribution systems
(Ieee-inst Electrical Electronics Engineers Inc, 2015)
An iterated sample construction with path relinking method: Application to switch allocation in electrical distribution networks
(2013-01-01)
We present a metaheuristic approach which combines constructive heuristics and local searches based on sampling with path relinking. Its effectiveness is demonstrated by an application to the problem of allocating switches ...