Prefabricated Reinforcement in Construction Using VDC: Case Study Ovalo Monitor Bridge
Fecha
2022Registro en:
30th Annual Conference of the International Group for Lean Construction, IGLC 2022
Autor
Tuesta Schuler, Rodrigo
Vicuña Jimenez, Mark Anthony
Del Savio, Alexandre Almeida
Palpan, Alejandro
Quiroz, Felipe
Valle, Erika
Institución
Resumen
In construction projects, there may be rework and delays associated with construction processes with a low level of industrialization, resulting from the lack of constructability of the designs. To promote industrialization and improve the project's constructability, we implemented the Virtual Design & Construction (VDC) methodology, combined with a system of prefabricated reinforcement cages (PRC) elements in constructing an 870-meter span bridge located in Lima, Peru. The objective was to reduce structural rebars' assembly times, replace the traditional on-site processes of cutting, bending, and assembling steel with an industrial process based on systems of PRC steel elements. As a result, the assembly times of the structural item were reduced by 31%, thanks to the use of PRC elements. In addition, due to the VDC methodology, a 100% buildable design of the PRC elements was achieved.