Daily Control System for the Construction of Multi-family Building Projects
Fecha
2021-01-01Registro en:
21903018
10.1007/978-3-030-57548-9_59
21903026
Smart Innovation, Systems and Technologies
2-s2.0-85098120291
SCOPUS_ID:85098120291
0000 0001 2196 144X
Autor
Fernandez, Diego
Zamora, Yeffry
Rodriguez, Sandra
Vilcapoma, Jorge
Institución
Resumen
Construction projects for buildings, in the execution stage, show a variation of the real with respect to what is planned in the budget. The consequence of this lag presented usually causes large economic losses. Given this situation, in the construction industry, various control systems have been developed that have as a final deliverable a frequent management report, which serves to make decisions regarding the analyzed, whose results are applied and evaluated after a specific period of time. These management reports have good results at the time of their application; however, data processing, analysis execution, and decision making take approximately 30 days. In this sense, the present investigation proposes to develop a control system focused in real time, generated by the daily control in the execution stage. The results show a reduction of waste in the main resources of multi-family building projects, and this is in labor and materials, identifying the causes that originate them and suggesting generic solutions, at the end of the workday.