Use of Data Acquisition Technologies to Optimize Construction Progress Monitoring Times in Residential Buildings
Fecha
2021-01-01Registro en:
21903018
10.1007/978-3-030-57548-9_58
21903026
Smart Innovation, Systems and Technologies
2-s2.0-85098125963
SCOPUS_ID:85098125963
0000 0001 2196 144X
Autor
Aronés, Marisol
Mendoza, Andrea
Rodriguez, Sandra
Ramirez, Humberto
Institución
Resumen
The monitoring systems that are currently used as part of the management of construction projects consist of collecting the field information, documenting it manually and then digitizing it. Those responsible for carrying out the reports through this procedure dedicate between 28% and 41% of their time daily for their preparation. This traditional process is slow and inefficient because the information is dispersed in different documents, so data can be omitted, causing that no corrective actions are taken in a timely manner. Likewise, the construction sector has little use of technological resources, and therefore, there is no automated process, which makes it difficult to monitor construction projects in an efficient way. In this sense, this research establishes the optimization of the control procedure through the use of a data acquisition tool to reduce the man-hours used in advance control. With the application of this proposal, the hours spent by the personnel involved in project management were reduced by 30%.